Laserfiche WebLink
<br />• <br /> <br /> <br />George O. Puig, P.E. <br />Project Engineer <br />~~ <br />-- ~__ <br />Education Bachelor of Science in Architectural <br />Engineering, 1968, University of Kansas <br />Registration Professional Engineer: Texas <br />Professional American Concrete Institute <br />Affiliations American Society of Civil Engineers <br />Experience Turner Collie & Braden Inc., Houston, Texas; <br />1969-present, Manager, Construction <br />Administration. <br />Responsible for coordination of engineering <br />services on projects which include water and <br />sewage treatment plants, and water control <br />structures. Work includes preliminary reports, <br />preparation of plans and specifications, con- <br />struction administration, and the use of <br />computer-aided design and drafting techniques. <br />Representative projects include the following. <br />• <br />City of Houston East Water Purification Plant. <br />Consists of several projects including a separate <br />facility to treat 50 mgd of potable water, and <br />enlarging of the existing facility from 80 mgd to <br />125 mgd capacity; sludge processing facilities; <br />a flood protection system, and several steel <br />ground storage tanks. <br />A 25 mgd addition <br />Bell County WC&ID <br />transmission line <br />facilities. Also <br />existing sewage t: <br />mgd capacity. <br />to an existing water plant for <br />No. 1 including a 17 mile-long <br />and prestressed ground storage <br />included an expansion of an <br />reatment plant from 9 mgd to 15 <br />City of Houston Southeast Water Purification <br />Plant. A new 16U mgd water purification plant <br />with an ultimate capacity of 750 mgd. <br />• <br />Sewage treatment facilities for Clear Lake City, <br />Kingwood, Texas A&M Univeristy, and many smaller <br />installations. <br />Finney and Turnipseed, Topeka, Kansas; 1967-1969, <br />Designer. <br />TurnerCollie c~SBracien Inc. <br />~' ,~ <br />