My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-06-20 Regular Meeting of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-06-20 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:39:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/20/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />n <br />U <br />CJ <br />James W. Johnson, Jr., P.E. <br />Project Engineer <br />e • <br />Education Bachelor of Science in Civil Engineering, 1973, <br />Clemson University <br />Registration Professional Engineer: Texas, 1981; <br />Virginia, 1977 <br />Experience Turner Collie & Braden Inc., Houston, Texas; <br />1978-present, Project Engineer. <br />Noteworthy projects include the following: <br />City of Alice, Texas and Alice Water Authority, <br />Raw Water Transmission Pipeline. Mechanical and <br />civil design of 20.5-mile 30-inch steel cylinder <br />reinforced concrete pipeline to include the addi- <br />tion of a 400-Hp raw water pump to an existing <br />pump station, metering facilities, pipeline surge <br />analysis, air release valve locations, and pipe <br />bend thrust restraints. <br />L~ <br />Kingdom of Saudi Arabia, Tanajib Community Update. <br />Analyzed projected population density and associ- <br />ated water and wastewater demands and recommended <br />improvements to the utility system to include pot- <br />able water distribution system line sizes, distri- <br />bution pumpage and storage, water treatment plant <br />capacity, wastewater treatment plant and lift <br />station capacities, and wastewater gravity sewer <br />collection system line sizes. <br />HCUD No. 5 (Kingwood). Offsite 1,500-gpm water <br />well including well and well pump design, piping, <br />and control building. <br />Copperfield Sewage Treatment Plant, Harris County, <br />Texas. Structural design of reinforced concrete <br />structures, steel frame building, and lift station <br />steel hoist frame. <br />Velsicol Chemical Corporation, Beaumont, Texas; <br />1977-1y78, Civil/Structural Design Engineer. <br />U.S. Army Corps of Engineers; 1973-1977, <br />Battalion Construction Officer. <br />• <br />TurnerCollie c~Braden Inc <br />E ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.