My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1984-06-20 Regular Meeting of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1984
>
1984-06-20 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:06:59 PM
Creation date
7/31/2025 10:39:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
6/20/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:~ f • ~ • <br />n <br />U <br />and office computations and drafting related to the <br />tasks. <br />2. Travel expenses when authorized by the City to points <br />other than the Engineer's office, City offices, or the <br />Project Area. <br />3. By subcontract or otherwise, perform soil consulta- <br />tions and/or test borings, and acquire other similar <br />information, investigations, and analyses. <br />4. Prepare special reports or studies required by <br />the City not covered under Aasic Services. <br />5. Preparation of environmental statements and assistance <br />to City in preparing for and attending public <br />• hearings. Appearances before regulatory agencies. <br />6. Assist the City as an expert witness or otherwise in <br />connection with any litigation with third parties or <br />administrative proceedings arising in relation to the <br />Project, provided such litigation was not caused by <br />the failure of the Engineer to perform in the first <br />instance. <br />7. After the final plans and specifications have been <br />approved by the City, evaluate items submitted by the <br />City to the Engineer for evaluation pursuant to the <br />Substitution Clause of a construction contract, <br />evaluate proposals for. change orders, prepare change <br />orders, or revise plans and specifications, provided <br />• that these services (a) are not made necessary by a <br />failure of the Engineer to perform in the firs t <br />instance and (b) take more than eight (8) hours of <br />services by the Engineer's employees to complete per <br />item. <br />8. Perform services related to a readvertisement for bids <br />(not caused by the Engineer's failure to perform in <br />the first instance). <br />• <br />-7- <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.