Laserfiche WebLink
<br /> <br /> <br />ITEM: SEALED BID l~0045 <br />Hpt Mix (Mod D), Asphalt .~ Radcliff Parker APAC, Prices Prices <br />Stabilized Base (Black Base), and ~Matl. Inc. Brothers Texas Under 1983- Under 1983- <br />Hot Mix-Cold Laid Asphalt 1984 1984 Con- <br />1• A. Hot Mix Asphaltic Concrete <br />• Pavement (Mod D) - Delivered <br />B. Hot Mix - Picked Up <br />2• A. Asphalt Stabilized Base <br />(Black Base) - Delivered <br />B. Picked Up <br />Contract tangency <br />031-06-84 Contract <br />30-06-84 032-06-8~ <br />029-06-84 033-06-8~ <br />26.25/ton $26.30/ton INo Bid ~$23 95/ton ~$23.95/tc <br />.95/ton $22.30/ton INo Bid ~20 00/ton ~20:75/to <br />25.25/ton ~$23.35/ton INo Bid $22 95/ton <br />• $23.45/t <br />$21.95/ton I $19.35/ton ~ No Bid I $19 00/ton , $20.25/tc <br />3. A. Hot Mix-Cold Laid Asphaltic <br />$27.85/ton No Bid No Bid $28.95/ton N/A <br />Concrete Pavement - Delivered <br />B. Picked Up <br />$24.95/ton No Bid No Bid $26.00/ton N/A <br /> <br />