Laserfiche WebLink
Turner Collie 013raden Inc. <br />May 3, 1984 <br />Mr. Jack Owen <br />City of LaPorte <br />Page Three <br />by the consultants at meetings in LaPorte beyond the four <br />meetings originally planned. A presentation before the Planning <br />and Zoning Commission and a presentation at the third public <br />meeting by these consultants were not anticipated in the original <br />scope of the project. In addition, because of the concern of the <br />P&Z Commission and the Review Committee over the new proposed <br />zoning ordinance, a special section of the Technical Report cover- <br />ing "Administrative Controls" was considered necessary. This was <br />not anticipated within the original scope. <br />As a result of the expanded scope described above, $3,500 in <br />excess of original budget is required to complete Task A. <br />Reproduction - The costs of reproduction are estimated to exceed <br />the original budget by approximately $2,100. We estimate that <br />about $900 of this amount is the cost for the 700 copies of the <br />Brochure Summary Report requested by the City in excess of the <br />250 copies called for in the original scope. We estimate $700 <br />of this amount is the cost for the 20 review copies of the <br />Technical Report which were not originally within the project <br />scope. The remaining $500 is the result of the expanded <br />Technical Report discussed under Task 1 above. <br />Total Cost Due to Expanded Scope <br />To summarize, we estimate that approximately $30,600 of the <br />$40,200 which the Comprehensive Plan is estimated to cost in <br />excess of the $129,430 originally budgeted for this assignment <br />is a result of the expansion of the project scope beyond that <br />originally budgeted as follows: <br />Task 1 = $25,000 <br />Task 6 - 3,500 <br />Reproduction - •2,100 <br />$30,600 <br />The remainder of the excess cost resulted from our underbudgeting <br />of the original scope of work. <br />