Laserfiche WebLink
~ •, • <br />July 22, 1985 <br />MEMO T0: Mayor and Cou cil ersons <br />FROM City Engineer ~ ~ <br />SUBJECT: BMW Utility Extension <br />At the July 15 workshop, I handed out a breakdown of Carlos <br />Smith's estimate for the cost of City participation in the above <br />referenced utility extension. Column 1 of the attached table <br />repeats that breakdown. <br />Bids were opened July 18 at City Hall, which reflected that McKey <br />Construction was low bidder for the extension oversized to serve <br />the land north of BMW at $ 120,810.15. Ben Felts was low bidder <br />for the extension to serve BMW and Barbour's Cut Import Service <br />at $80,709.00. The difference between those bids ($ 40,101.15) <br />will be the City's share of the construction cost. Column 2 is a <br />breakdown of the differences for comparison to Column 1. Note <br />that we have included a 10~ allowance for engineering and 596 for <br />change orders and that the City's share should not exceed <br />$ 46,100, instead of $50,500 as previously estimated. <br />Staff recommends award of the contract for the BMW utility <br />Extension to McKey and approval of City participation up to <br />$ 46,100. <br />cc. John Joerns <br />