Laserfiche WebLink
,~ <br />• • <br />PROPOSED BMW/BCIS UTILITY EXTENSION <br />COST OF OVERSIZING <br />Column 1 <br />ENGINEER'S <br />COST ESTIMATE <br />WATER MAIN EXTENSION <br />2440 feet of 12" (instead of 8") <br />water main from the existing <br />termination point in Oak Park <br />Mobile Home Park to the south <br />end of the new BMW plant. <br />TOTAL WATER MAIN OVERSIZING $ 24,600 <br />OVERSIZING CONSTRUCTION COST <br />SANITARY SEWER EXTENSION <br />1170 feet of 6" (instead of 4") <br />force main from the above <br />termination point to the lift <br />station site near the <br />BCIS Main Gate 4,200 <br />350 gallons per minute <br />(instead of 115 GPP1) <br />sanitary sewer lift station <br />535 feet of 10" (instead <br />of 8") gravity sewer from the <br />new lift station to new Manhole 3 <br />TOTAL SANITARY SEWER OVERSIZING <br />CONSTRUCTION COST <br />TOTAL UTILITY EXTENSION <br />OVERSIZING CONSTRUCTION COST <br />ENGINEERING COSTS <br />CONTINGENCY <br />TOTAL OVERSIZING COSTS <br />10,000 <br />6,700 <br />$ 20,900 <br />$ 45,500 <br />$ 5,000 <br />NONE <br />$ 50,500 <br />Column 2 <br />CONTRACT <br />LOW BID <br />$ 21,626.15 <br />5,010.00 <br />14,000.00 <br />(635.00) <br />$ 18,475.00 <br />$ 40,101 .15 <br />$ 4,010.12 <br />1,988.73 <br />$ 46,100.00 <br />