My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1986-07-28 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1986
>
1986-07-28 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:40:54 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/28/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Summary of \iork <br /> <br />Alternate No.4: <br /> <br />Alternate No.5: <br /> <br />Alternate No.6: <br /> <br />Alternate No. 7: <br />Alternate No. 8: <br />Alternate No. g: <br />Alternate No. 10: <br />Alternate No~ 11: <br />Alternate No. 12: <br />Alternate No. 13: <br />Alternate No. 14: <br /> <br />e <br /> <br />It <br /> <br />Page 2 <br /> <br />Replace .or repair all electrical systems as needed <br />including exit and emergency lighting systems. <br /> <br />Test and repair all sanitary plumbing, potable <br />water systems, and fixtures. <br /> <br />Remove and replace with new material approx. 3,800 <br />square feet of maple dance floor with sub-floor <br />and screed. <br /> <br />Remove and replace approx. 8,000 square feet of <br />vinyl floor tile. <br /> <br />Remove and replace carpet on stage and entry hall. <br /> <br />Repair all damaged wall surfaces. <br /> <br />Remove and repl~ce all vinyl cove base. <br /> <br />Remove gasoline storage tanks and related piping. <br /> <br />Install a manual pull station fire alarm system. <br /> <br />Re-design handrails, around the wood deck, to <br />meet code. <br /> <br />Repair storm water pumps. <br /> <br />Immediately following Award of Contract, prepare and distribute to <br />each' ent i ty invol ved in performance of the work, a not i fica t ion of <br />status of each Alternate. Indicate which Alternate has been 1) <br />accepted, 2) rejected, and 3) deferred for consideration at a later <br />date. Al terna tes should be bid wi th the knowl edge that they may be <br />accepted up to and including 120 days after execution of the contract. <br />Includ e full desc r ipt ion of negot ia ted mod ificat ion to Al terna te, if <br />any. <br /> <br />End of Section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.