My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1986-08-25 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1986
>
1986-08-25 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:40:58 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
8/25/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CITY OF LA PORTE <br />INTER-OFFICE MEMORANDUM <br />• <br />TO: Richard Hare, Assistant City Manager DATE: August 21, 1986 <br />FROM: Bert Clark, Parks Superintendent <br />SUBJECT: REPLACEMENT OF AIR CONDITIONING UNIT <br />The air conditioning heating unit at Evelyn Kennedy Civic Center that <br />needs replacing is a ten (10) ton Tappan Model RTA-120-30031-C. <br />Determining the exact period of time that unit has been in service is <br />impossible, there is no available documentation concerning purchase or <br />installation. However, we have been able to ascertain that the unit <br />has been in service a minimum of ten (10) years. <br />Moore Refrigeration and Barretts Air Conditioning have both inspected <br />the existing Tappan unit and have found that the two (2) compressors <br />are irrepairable and must be replaced at a cost of $1,000.00 each. The <br />coils are contaminated with burnt oil and freon which although could be <br />flushed at a cost of $600.00, would still not place the unit in a status <br />that could be considered reliable. Currently we have $6,500 in the <br />contingency account 001-607-607-900 available for replacement of the unit. <br />Bids were taken on a ten (10) ton heat pump unit. The bid invitations <br />were mailed to six (6) different firms. We received five (5) bids. <br />The low bidder was Barretts Air Conditioning for $6,324.00 with a 2~ <br />discount for prompt payment. It is anticipated that the installation <br />will be accomplished within five (5) days. I recommend we accept low bid. <br />If you should have any questions, please call me. <br />BC/lw <br />
The URL can be used to link to this page
Your browser does not support the video tag.