My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-02 Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1987
>
1987-07-02 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:41:09 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/2/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
u <br /> <br />8 . S~zbmit. final cont. r. art doc~.zments to the City for <br />final review, and to State I7ep~~rtment of Hea7.th for approval, <br />with Engineering Report. <br />9 . tTpon final approval by the Ci.t.y, furnish C:i.ty with <br />five copies of final contr. act. doc~.zm~nts , f ina.l detailed <br />construction cost estimate and mylar r.eproducibles of the <br />contract drawings. F~zr.n.ish additional. copies of final contract <br />documents and detailed construction drawings as needed fox• <br />bidding process. <br />CONSTRUCTION PHASE <br />Upon completion of th? Design Phase ar~cl upon written <br />approval of the City, the Engineer shall proceed with trio <br />Construc:tior, Phase:. Work to he performed uncles the Constr~_zc:t:i.on <br />Phase slxall include the following: <br />1. Assist. the City in advertising for bid:, for the Frojc:et. <br />and notifying prospective Contractors of tl:~e scope of tl-i~, <br />Project. <br />2 . Cond~.ict pre ~-bid conferences . <br />r~i.ds . <br />8. Assist tl~e Cit.v i.n recei.ving, opening and analyzing <br />4. .Make recommendation to the City for award of the <br />contract to the lowest qualified Contractor. <br />5. Notify Cont.x•actor of award of bid and prepare Contr. act. <br />Documents with approval of City Attorney. <br />F . Conduct Pre--Constr~.zction conferences . <br />7. Perform field construction .layout, ie: Alignment and <br />grade and apptxrtenrancc locations. <br />li. Perform. contract admi.nist.rati.or~ during constructi.an. <br />Page ~ of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.