My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-02 Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1987
>
1987-07-02 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:41:09 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/2/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />III. SGHEDL~LE <br />ThF~ En~;in~~er is ready, willing and able to start, wc~rl~: <br />immediately upon receipt c>f ~ signed contract with the City c?n <br />this projc;ct. Anticipated schedule of completion raf reach phase <br />is as outlined bE:low, k~ased on wo.rkirig days. <br />A. Preliminary Engileering Phase <br />1. Field ~~Ur.veys 7 days <br />2. Preparation of Prelimilary <br />des:igr~, pl<~.n, and. report. ~} days <br />ESTIMATED TIME ~ days <br />B, Final Design Phase <br />1. Final Fif}lcl ~urvc:ys J day <br />Prepar~~ti.on af. Preliminary <br />Contr. ar.-t. Document:; , e:tc . ~ days <br />3. Preparr-ztion f.~f Final <br />Contract Documentti ~ clays <br />ESTIMATED TIME 11 drys <br />C. Construction Phase <br />1. Cor,structi.on Layout. 2 days <br />?.. Ccantrctct Administra.tian 4 days <br />ESTIMATED TIME 6 days <br />TOTAL ESTIMATED TIME 23 ~J.ays <br />IV. CCIMPENS~TInN <br />A. Preliminary Engineering Phase: <br />Fee laared on per diem rates and +~stim~+tf.d time schedu:l~~ <br />~f>, 00~. [~Q <br />Page 5 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.