Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />~ - <br /> <br />G. Conditions: <br /> <br />If conceptual cost estimate is significantly greater or <br />less than the final cost estimate prepared after final plans and <br />specifications have been accepted, the total fee will be adjusted <br />to meet 85% of Curve B of the A.S.C.E. Manual No. 45. <br /> <br />Page 7 of 16 <br />