My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-27 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1987
>
1987-07-27 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:41:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/27/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />~ <br /> <br />IV. COMPENSATION <br /> <br />A. Preliminary Engineering Phase: <br /> <br />Flat fee of $24,000.00 based on the conceptual cost <br />estimate as attached Exhibit B-1 and B-2 and Curve B of the ASCE <br />Manual No. 45. 45% of 85% of total fee from the Curve. <br /> <br />B. Design Phase: <br /> <br />Flat fee of $28,000.00 based on the conceptual cost <br />estimate as attached Exhibit B-1 and B-2 and Curve B of the ASCE <br />Manual No. 45. 55% of 85% of total fee from the curve. <br /> <br />C. Construction Phase: <br /> <br />services. <br /> <br />This contract does not include construction phase <br /> <br />D. Special Services: <br /> <br />As outlined in the T.S.P.E. Manual we would perform at <br />our direct payroll (salary) costs plus 27% for overhead, etc., <br />times a multiplier of 2.5. These special services are limited to <br />the items on the enclosed list of special services from the <br />T. S. P. E. Manual, "General Engineering Services", attached Exhi bi t, <br />A. <br /> <br />Field surveys to collect information required for both <br />preliminary and design phases shall be performed at our direct <br />payroll (salary) costs plus 27% times a multiplier of 2.0. <br />Preliminary Cost Estimate of this service is attached hereto as <br />Exhibit C. <br /> <br />Soil and foundation investigations including field and <br />laboratory testing and related engineering analysis and <br />recommendations would be contracted for at our cost plus 10% for <br />handling or may be furnished by the City. <br /> <br />E. Travel: <br /> <br />Travel expenses will not be charged for within the <br />limits of Harris County. Travel outside the County is computed <br />at the rate of 30 cents per mile. <br /> <br />F. Terms: <br /> <br />Invoices will be submitted monthly based on estimated <br />percentage of completion with net payment due within 30 days of <br />invoice. Late payments will incur a late charge of one and on- <br />half (1 1/2) percent per month from the original invoice date. <br /> <br />Page 6 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.