My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1987-07-27 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1980's
>
1987
>
1987-07-27 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:00 PM
Creation date
7/31/2025 10:41:13 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/27/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />~- <br /> <br />CONSTRUCTION PHASE <br /> <br />It is understood by the Engineer that the construction of <br />this project will be delayed until such time as the City issues <br />additional General Obligation bonds. Should the City so desire, <br />the Engineer, will perform the Construction Phase items as <br />outlined in the Texas Society of Professional Engineers Manual <br />"General Engineering Services", at such time as the construction <br />of the project is undertaken. These services, if furnished, <br />shall be based on a separate contract agreed to by Owner and <br />Engineer. <br /> <br />III. SCHEDULE <br /> <br />The Engineer is ready, willing and able to start work <br />immediately upon receipt of a signed contract with the City on <br />this project. Anticipated schedule of completion of each phase <br />is as outlined below, based on working days. <br /> <br />A. Preliminary Engineering Phase <br />1. Field Investigation of <br />Existing Utilities <br /> <br />10 days <br /> <br />2. Preparation of Preliminary <br />design, plan, and report <br /> <br />20 days <br /> <br />TOTAL ESTIMATED TIME <br /> <br />30 days <br /> <br />B. Final Design Phase <br /> <br />1. Final Field Surveys <br /> <br />5 days <br /> <br />2. Preparation of Preliminary <br />Contract Documents, etc. <br /> <br />10 days <br /> <br />3. Preparation of Final <br />Contract Documents <br /> <br />10 days <br /> <br />TOTAL ESTIMATED TIME <br /> <br />25 days <br /> <br />Review time by the City is not included in this schedule and <br />any delays occasioned in the review process will necessitate the <br />extension of this schedule. <br /> <br />Page 5 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.