Laserfiche WebLink
<br />e <br /> <br />CITY OF LA PORTE <br /> <br />e <br /> <br />~- <br /> <br />EAST "E" STREET - UTILITY ADJUSTMENTS <br /> <br />VII. CONCEPTUAL COST ESTIMATE (cont.> <br /> <br />WATER LINE REPLACEMENT: <br /> <br /> 1,650 l.f. 8" P.V.C. water line @ :$ 7.50 <br /> 3 ea. Wet Connections @ $ 500.00 <br /> 8 ea. Wet Connections Small @ $ 500.00 <br /> 160 l.f. 16" Casing - Open Cut @ $ 12.00 <br /> 180 l.f. 4" P.V.C. water line @ :$ 4.00 <br /> 9 ea. 4" Gate Valve t< Box @ $ 200.00 <br /> 3 ea. 8" Gate Valve t< Box @ :$ 400.00 <br /> 50 tons Cement Stabilized Sand @ $ 17.00 <br /> 40 l.f. 16" Bore t< Jack @ $ 45.00 <br /> Estimated Constructi on Cost <br />SEWER LINE REPLACEMENT: <br /> 520 l.f. 6" P.V.C. 0/6' @ :$ 6.00 <br /> 420 l.f. 8" P.V.C. 6/8' @ :$ 7.50 <br /> 4 ea. Standard Manholes @ :$ 800.00 <br /> 1 ea. Cleanout @ :$ 200.00 <br /> 45 tons Cement Stabilized Sand @ :$ 17.00 <br /> Esti mated Construct i on Cost <br /> Total Estimated Construction Cost <br /> Contingencies @ 20'l. <br /> Total Estimated Cost <br /> TOTAL ESTIMATED PROJECT COST <br /> <br />EXHIBIT B-2 <br /> <br />$ 12,375.00 <br />$ 1,500.00 <br />$ 4,000.00 <br />:$ 1,920.00 <br />:$ 720.00 <br />:$ 1,800.00 <br />$ 1,200.00 <br />$ 850.00 <br />$ 1,800.00 <br />$ 26,165.00 <br /> <br />$ 3,120.00 <br />$ 3,150.00 <br />$ 3,200.00 <br />$ 200.00 <br />$ 765.00 <br />$ 10,435.00 <br />$ 36,600.00 <br />$ 7,320.00 <br />$ 43,920.00 <br />$1,013,997.00 <br />