Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />r <br /> <br />CITY OF LA PORTE <br />EAST "E" STREET IMPROVEMENTS <br />SPECIAL SERVICES COST ESTIMATE <br /> <br />ENGINEERING FIELD SURVEYING <br /> <br />1. Horizontal and Vertical Control <br /> <br />84 man hours <br /> <br />$ 2,224.60 <br /> <br />2. Utility Location and Verification <br />240 man hours <br /> <br />$ 6,356.00 <br /> <br />3. Topographic Surveying <br /> <br />120 man hours <br /> <br />$ 3,178.00 <br /> <br />4. Geophysical Laboratory Services <br /> <br />$ 1,500.00 <br /> <br />TOTAL ESTIMATED COST <br /> <br />$13,258.60 <br /> <br />':',i <br /> <br />EXHIBIT C <br />