<br />EXHIBIT A
<br />SUMMARY OF BIDS RECEIVED
<br />Name of Contractor Base Bid
<br />ASPHALT PAVING, DRAINAGE ~ UTILITIES
<br />[City Engineer estimate] [124,289.00]
<br />1. Fairmont Paving & Util. 122,162.80
<br />2. Allgood Const. Co., Inc. 135,073.25
<br />3. HUBCO, Inc. 136,653.00
<br />4. McKey Const. & Equip.,Inc 134,607.60
<br />5. Buffalo Excavating & Pvg. 158,924.40
<br />6. Jaco Const., Inc. 161,327.00
<br />7. Hatcher Const. Co., Inc. 198,778.00
<br />CONCRETE PAVING, DRAINAGE & UTILITIES
<br />[City Engineer estimate] [157,099.00]
<br />1. Allgood Const. Co., Inc. 136,704.25
<br />2. Fairmont Paving & Utls. 172,136.00
<br />3. McKey Const. & Equip. 168,955.86
<br />4. Buffalo Excavating & Pvg. 178,818.40
<br />5. Hatcher Const. Co., Inc. 175,546.00
<br />6. Jaco Const., Inc. 188,281.20
<br />7. Hubco, Inc. 198,029.00
<br />•
<br />Contingency
<br />Work Items
<br />[16,620.00]
<br />10,380.00
<br />13,148.00
<br />12,726.00
<br />16,120.00
<br />8,780.00
<br />14,313.60
<br />16,720.00
<br />[16,620.00]
<br />13,148.00
<br />10,380.00
<br />16,120.00
<br />8,780.00
<br />16,720.00
<br />14,313.60
<br />12,726.00
<br />Adjusted
<br />Base Bid
<br />[140,909.00]
<br />132,542.80
<br />148,221.25
<br />149,379.00
<br />150,727.60
<br />167,704.40
<br />175,640.00
<br />215,498.00
<br />[173,719.00]
<br />149,852.25
<br />182,516.00
<br />185,075.86
<br />187,598.40
<br />192,266.00
<br />202,531.80
<br />210,755.00
<br /># Construction access road, brush removal, select fill, and
<br />replacement of 24" concrete culvert pipe.