Laserfiche WebLink
<br />EXHIBIT A <br />SUMMARY OF BIDS RECEIVED <br />Name of Contractor Base Bid <br />ASPHALT PAVING, DRAINAGE ~ UTILITIES <br />[City Engineer estimate] [124,289.00] <br />1. Fairmont Paving & Util. 122,162.80 <br />2. Allgood Const. Co., Inc. 135,073.25 <br />3. HUBCO, Inc. 136,653.00 <br />4. McKey Const. & Equip.,Inc 134,607.60 <br />5. Buffalo Excavating & Pvg. 158,924.40 <br />6. Jaco Const., Inc. 161,327.00 <br />7. Hatcher Const. Co., Inc. 198,778.00 <br />CONCRETE PAVING, DRAINAGE & UTILITIES <br />[City Engineer estimate] [157,099.00] <br />1. Allgood Const. Co., Inc. 136,704.25 <br />2. Fairmont Paving & Utls. 172,136.00 <br />3. McKey Const. & Equip. 168,955.86 <br />4. Buffalo Excavating & Pvg. 178,818.40 <br />5. Hatcher Const. Co., Inc. 175,546.00 <br />6. Jaco Const., Inc. 188,281.20 <br />7. Hubco, Inc. 198,029.00 <br />• <br />Contingency <br />Work Items <br />[16,620.00] <br />10,380.00 <br />13,148.00 <br />12,726.00 <br />16,120.00 <br />8,780.00 <br />14,313.60 <br />16,720.00 <br />[16,620.00] <br />13,148.00 <br />10,380.00 <br />16,120.00 <br />8,780.00 <br />16,720.00 <br />14,313.60 <br />12,726.00 <br />Adjusted <br />Base Bid <br />[140,909.00] <br />132,542.80 <br />148,221.25 <br />149,379.00 <br />150,727.60 <br />167,704.40 <br />175,640.00 <br />215,498.00 <br />[173,719.00] <br />149,852.25 <br />182,516.00 <br />185,075.86 <br />187,598.40 <br />192,266.00 <br />202,531.80 <br />210,755.00 <br /># Construction access road, brush removal, select fill, and <br />replacement of 24" concrete culvert pipe. <br />