Laserfiche WebLink
<br />--. ........ -- - - - ...- - - - - - - <br /> e e <br /> MEMORANDUM <br />DATE: March 16, 1990 <br />TO: Scott Brinks <br />FROM: Gabe Bove <br />SUBJECT: INTERNATIONAL CARGO NETWORK <br /> BARBOURS CUT <br /> PROJECT #5322 <br /> <br />The following paragraphs describes the drainage design, per your <br />request of March 15, 1990: <br /> <br />The existing site drains from north to south along <br />roadside ditches at Kansas Avenue and N. Broadway <br />street to a major outfall ditch on the north side of <br />Adams Street (east and west) . <br /> <br />We propose to construct an on site stormwater collection <br />system (based on a three year rainfall event) which will <br />pipe water to two north-south drainage ditches. The major <br />ditch will run approximately from the north property line <br />south to the Adams Street outfall. This ditch will be in <br />the old Kansas Avenue right of way (closed) and will drain <br />approximately 2/3 of the site. A second ditch will be <br />constructed by regrading the east ditch in N. Broadway <br />Street. Culverts will be provided at all driveways and road <br />intersections. <br /> <br />Please call if we can be of further assistance. <br /> <br />GMB/ew <br /> <br />xc: City of LaPorte <br /> <br />EXHIBIT I <br />