My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990-10-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1990
>
1990-10-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
7/31/2025 10:44:54 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/22/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~PEY, HUSTON & ASSOCIATES, IN• <br />Project No.: 12355-40 Sheet 2 of 7 <br />Date: October 15, 1990 <br />C. Revision in Price: <br />Reduction based on the deletion of 20 thousand board-feet <br />measure at $90.00 unit price (Extra Work Item No.l). ($1,800.00) <br />3. A. Description of Chances Involved: <br />Delete "Steel Sheet Piling Shoring" from the construction <br />contract. <br />B. Reason for Chance: <br />This item is not anticipated to be left in place for this project. <br />C. Revision in Price: <br />Reduction based on deletion of 5 tons at $500.00 per ton <br />(Extra Work Item No. 2.). ($2,500.00) <br />4. A. Description of Changes Involved: <br />Delete "Concrete Pipe Encasement or Cradle, Complete in <br />Place" from the construction contract. <br />B. Reason for Chance: <br />This item is not anticipated to be used for this project. <br />C. Revision in Price: <br />Reduction based on the deletion of SO cubic yards at $55.00 <br />per cubic yard (Extra Work Item No. 4). ($2,750.00) <br />5. A. Description of Chances Involved: <br />Delete bore & jack installations at Stations 51+55, 52+10, 52+90 and 54+00. <br />Reduce the estimated quantity for the contract unit price item <br />No. A.9., "36-inch Sanitary Sewer, installed by Bore & Jack, <br />Complete in Place" from 325 linear feet to 245 linear feet for <br />a net reduction of 80 linear feet. Increase the estimated <br />quantity for the contract unit price item No. A.7., "36-inch <br />Sanitary Scwcr, Complete in Place" from 6,875 linear feet to <br />6,955 linear feet for a net increase of 80 linear feet. <br />B. Reason for Chance: <br />Remove trees and install 36-inch gravity Scwcr by open cut con- <br />struction in lieu of by boring and jacking in order to reduce <br />construction costs as directed by Uvner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.