Laserfiche WebLink
~PEY, HUSTON & ASSOCIATES, IN• <br />Project No.: 12355-40 Sheet 2 of 7 <br />Date: October 15, 1990 <br />C. Revision in Price: <br />Reduction based on the deletion of 20 thousand board-feet <br />measure at $90.00 unit price (Extra Work Item No.l). ($1,800.00) <br />3. A. Description of Chances Involved: <br />Delete "Steel Sheet Piling Shoring" from the construction <br />contract. <br />B. Reason for Chance: <br />This item is not anticipated to be left in place for this project. <br />C. Revision in Price: <br />Reduction based on deletion of 5 tons at $500.00 per ton <br />(Extra Work Item No. 2.). ($2,500.00) <br />4. A. Description of Changes Involved: <br />Delete "Concrete Pipe Encasement or Cradle, Complete in <br />Place" from the construction contract. <br />B. Reason for Chance: <br />This item is not anticipated to be used for this project. <br />C. Revision in Price: <br />Reduction based on the deletion of SO cubic yards at $55.00 <br />per cubic yard (Extra Work Item No. 4). ($2,750.00) <br />5. A. Description of Chances Involved: <br />Delete bore & jack installations at Stations 51+55, 52+10, 52+90 and 54+00. <br />Reduce the estimated quantity for the contract unit price item <br />No. A.9., "36-inch Sanitary Sewer, installed by Bore & Jack, <br />Complete in Place" from 325 linear feet to 245 linear feet for <br />a net reduction of 80 linear feet. Increase the estimated <br />quantity for the contract unit price item No. A.7., "36-inch <br />Sanitary Scwcr, Complete in Place" from 6,875 linear feet to <br />6,955 linear feet for a net increase of 80 linear feet. <br />B. Reason for Chance: <br />Remove trees and install 36-inch gravity Scwcr by open cut con- <br />struction in lieu of by boring and jacking in order to reduce <br />construction costs as directed by Uvner. <br />