My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990-10-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1990
>
1990-10-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
7/31/2025 10:44:54 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/22/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.SPEY, HUSTON & ASSOCIATES, I~ <br />Project No.: 12355-40 <br />Date: October 15, 1990 <br />C. Revision in Price: <br />1) Reduction of $16.800.00 based on deleting 80 linear feet of <br />36" sanitary sewer installed by bore & jack at $210. per L.F. <br />(contract unit price item No. A.9.). <br />2) Addition of $6,432.00 based on adding 80 linear feet of 36" <br />sanitary sewer installed by open cut at $80.40 per L.F. <br />(contract unit price item No. A.7.). <br />Sheet 3 of 7 <br />Net Reduction ($10,368.00) <br />6. A. Description of Changes Involved: <br />Revise the following scope of work as noted from the contract <br />bast bid, lump sum construction item No. 8.1. for "Lift <br />Station...". <br />1) Revise the lift station from square structure with 16' x <br />22.5' inside dimensions to round structure with 22.5' <br />inside diameter. Reduction of $9,000.00 based on reduction <br />of 50 cubic yards of concrete and maintaining the same area <br />ratio of reinforcing steel to concrete. <br />2) Delete proposed 6" thick crushed limestone access road to <br />lift station. <br />3) Delete the proposed lift station gantry crane fora reduc- <br />tion of $3,000.00 <br />4) Delete 80 L.F. of proposed 24" RCP culvert running north- <br />south within east side of lift station site. <br />S) Delete two (2) proposed culvert inlets within the lift <br />station site. <br />6) Relocate the east-west culvert inside lift station site <br />southward approximately 4S feet or approximately 10 feet <br />south and outside of gate. <br />7) Add approximately SO linear feet of drainage swale just <br />north and outside of the lift station site and draining from <br />cast to west, matching the proposed culvert ilowline elevation <br />of 10.0 ±. <br />8) Provide a 10 KVA 1-phase transformer and a 20 circuit, 120240 <br />volt lighting panel in lieu of a 1S ICVA 3-phase 480 - 120/208 <br />volt transformer and 24 circuit 3-phase lighting panel for a <br />reduction of $478.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.