My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990-10-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1990
>
1990-10-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
7/31/2025 10:44:54 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/22/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ESPEY, HUSTON & ASSOCIATES, ~. <br />Project No.: 12355-40 Sheet 5 of 7 <br />Date: October 15, 1990 <br />4) Addition of $2,510.00 based on the addition of two (2) - 3G" bend <br />fittings at $1,255.00 per each (new contract unit price item). <br />Net Reduction ($16,671.00) <br />8. A. Description of Changes Involved: <br />Provide 8" sanitary sewer along East "E" street in lieu of 12" <br />slipline of existing 15" sanitary sewer along Iowa and East "H" <br />street. The City of LaPorie (Owner) to assume responsibility for <br />the adjacent 6" waterline (i.e. damages, breaks, line isolations, and <br />repairs except damages and breaks due to negligence by the Contractor) <br />and to provide for all associateri traffic control along East "E" Street. <br />Contractor will be responsible for functional clean-up, maintaining <br />drainage and maintaining driveway access. <br />B. Reason for Change: <br />Cost reduction measure by Owner. <br />C. Revision in Price: <br />1) Reduction of $41,160.00 for dclction of "Sliplinc 15-inch <br />Sanitary Sewer (12-inch Liner)..." (Contract unit price item <br />No. A.17.). <br />2) Reduction of $3,700.00 for deletion of "Existing Manhole Rehab- <br />ilitation and Sealing (All depths)..." (Contract unit price item <br />No. A.18.). <br />3) Reduction of $1,000.00 for deletion of "Reconnect Service Lines <br />via Excavation on Sliplined Sewers..." (Contract unit price item <br />No. A.19.). <br />4) Reduction of $1,125.00 for dclction of 25 linear feet of 15" <br />sanitary sewer (contract unit price item No. A.4.). <br />5) Reduction of $500.00 for deletion of proposed 15" sanitary sewer <br />connection to existing manhole (unit price item No. A.22.C.). <br />6) Reduction of $650.00 for deletion of proposed 15" manhole drop <br />(unit price item No. A.25.D). <br />7) Reduction of $36.00 for deletion of 3 feet extra depth manhole drop <br />for 15" sewer (unit price item No. A.26.D.). <br />8) Addition of $20,700.00 for addition of 690 linear feet of 8" <br />sanitary sewer along East "E" Street (contract unit price item <br />No. A.1.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.