My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990-10-22 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1990
>
1990-10-22 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
7/31/2025 10:44:54 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/22/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~EY, HUSTON & ASSOCIATES, IN~ <br />Project No.: 12355-40 <br />Date: October 15, 1990 <br />9) Addition of $172.50 for addition of 690 linear feet of "Trench <br />Safety System" (contract unit price item No. A.35.). <br />10) Addition of $3,900.00 for addition of two (2) - 48" diameter <br />fiberglass manholes at $1,950.00 per each (new contract unit <br />price item). <br />11) Addition of $350.00 for addition of one (1) - 8" manhole drop <br />(contract unit price item No. A.25.B.). <br />12) Addition of $100.00 for addition of one (1) - 15" sanitary sewer <br />plug (contract unit price item No. A.24.C.). <br />Sheet 6 of 7 <br />13) Addition of $2,520.00 for addition of 140 cubic yards of cement <br />stabilized sand (contract unit price item No. A.37.). <br />14) Addition of $64.00 for saw cut and removal of 64 square yards <br />estimated quantity of existing asphalt paving at Virginia Ave. and <br />Iowa Ave. (contract unit price Item No. A.28.). <br />15) Addition of $600.00 for addition of 24 cubic yards of crushed <br />limestone for temporary street and driveway repair (contract unit <br />price item No. C.3.). Permanent street and driveway paving along <br />East "E" Street to be constructed and paid for by others. <br />Net Reduction ($19,764.50) <br />II. CONTRACT SUPPLEMENT CONDITIONS: <br />1. Any additional work to be performed under this Contract Supplement shall be <br />carried out in compliance with the specifications and under the provisions <br />of the Original Contract including compliance with applicable Equipmcnl <br />Specifications, General Specifications and Project Specifications for the same type of <br />work. <br />2. The Contract Supplement unless otherwise provided herein does not relieve the <br />Contractor from strict compliance with the guarantee provisions of the Original <br />Contract, particularly those pertaining to performance and operation of equipment. <br />3. All contract unit price items reduced in quantity or deleted in their entirety under this <br />Contract Supplement may be added back to the Contract and used for this project at the <br />original Contract unit bid price based on the original contract estimated quantities if <br />required and approved by the Owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.