My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1991-01-14 Regular Meeting
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1991
>
1991-01-14 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:02 PM
Creation date
7/31/2025 10:45:03 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
1/14/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
u <br />• <br />sewage for chemical content analysis. This anal}~sis shall be supplied to the <br />Contractor for his information. The Contractor shall supply various types of <br />cured resin coupons to the Authorized City Representative for the City's use in <br />selection of the appropriate resin. <br />d. Materials: <br />The flexible felt fiber tube shall be fabricated to a size that when installed it will <br />neatly fit the internal circumference of the conduit specified by the City. An <br />allowance shall be made for some circumferential stretching during inversion. <br />The minimum length shall be that deemed necessary by the Contractor to <br />effectively span the distance from the inlet to the outlet of the respective <br />manholes unless otherwise specified. The Contractor shall verify the lengths in <br />the field before impregnation of the tube with resin. Individual inversion runs <br />can be made over one or more manhole sections as determined in the field by <br />the Contractor and approved by the Authorized City Representative. <br />The outside of the tube, before installation, shall have an impermeable plastic <br />coating. This coating will form the inner layer of the finished pipe and is <br />required for enhancement of corrosion, flow, and abrasion properties. <br />The layers which constitute the pipe wall must be such that when the <br />thermosetting resin cures, the total wall thickness must be homogeneous with no <br />internal layer of plastic which might weaken the pipe wall and allow internal <br />shear. When cured the CIPP must form a mechanical bond with the conduit. <br />Unless otherwise specified, the Contractor shall furnish a general purpose, <br />unsaturated, polyester resin and catalyst system compatible with the inversion <br />process that provides cured physical strengths specified herein. <br />The materials used shall result in an installed CIPP flow capacity which will have <br />equal to or greater than 100% of the original pipe's flow capacity when new. <br />A bidder may propose alternate materials to perform the lining. This proposal <br />must have a minimum of ten (10) days prior approval as an equal " rip 'or to" bid <br />opening. This approval may only- come from the City's Authonzed <br />Representative. <br />The Contractor shall have on hand sufficient material to perform the work he is <br />assigned within ten (10) days of Notice to Proceed. <br />The existing sewers, where designated or required shall be lined using materials <br />and workmanship which can be adapted to the restrictions of the work site. The <br />Contractor shall not begin this phase of the work until there is sufficient <br />materials on hand to complete the~ob. <br />The Contractor shall furnish to the City's Authorized Representative, prior to <br />use of the lining material, satisfactory certification from an approved testing <br />laboratory as to the results of testing the proposed lining material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.