Laserfiche WebLink
• <br />In addition to the above structural requirements, satisfactory evidence shall be <br />provided by the Contractor to the City's Authorized Representative that the <br />proposed lining material will incorporate a polyester resin that is suitable for <br />chemical resistance. <br />e. Physical Strength: The CIPP shall conform to the minimum structural standards, <br />as listed below. <br />Pipe Size <br />Flexural Stress #101 (Modified ASTM D-790) 4,500 psi <br />Flexural Modulus #101 (Modified ASTM D-790) 250,000 psi 8" thru 12" <br />of Elasticity 500,000 psi 15" and greater <br />(Values shown are for polyester resins commonly used in the United States. <br />Values for non-typical polyester, vinyl ester and epoxy resins may be substituted <br />when applicable.) <br />f. Deviations: The Contractor shall submit his price proposal for the appropriate <br />length, size and thickness designated in the proposal section. The deterioration <br />of sewers is an ongoing process. Should pre-inversion inspections reveal the <br />sewers to be in substantially different conditions than those in the design <br />consideration, the Contractor shall request appropriate changes in the CIPP <br />thickness, supporting such request with design data based upon the structural <br />design parameters contained in the latest edition of the Insituform Engineering <br />Design Guide or the design guide of an approved equal process. The deviation, <br />if approved, shall be reflected by the appropriate increase or reduction in the <br />unit cost for that size as agreed to by the Authorized City Representative. <br />g. Pre-Installation Procedures: The following installation procedures shall be <br />adhered to unless otherwise approved by the Owner's Representative. <br />Safety -The Contractor shall carry out his operations in strict accordance with all <br />applicable OSHA standards. Particular attention is drawn to those safety <br />requirements involving work on an elevated platform and entry into a confined <br />space or the use of steam. <br />Pre-inversion Cleaning - It shall be the responsibility of the Contractor to remove <br />all loose debris which is located within the sewer pipe. <br />Pre-inversion Inspection -Inspection of sewer pipe shall be performed by <br />experienced personnel trained in locating breaks, obstacles and service <br />connections by closed circuit television inspection. The interior of the pike shall <br />be carefully inspected to determine the location of any conditions which may <br />prevent proper installation of the CIPP, and it shall be noted so that these <br />conditions can be corrected. A videotape and suitable log shall be kept for later <br />reference by the City and/or Contractor. <br />Bypassing Sewage -When required for acceptable completion of an. inversion <br />process task, the Contractor shall provide for sewage flow maintenance around <br />the section or sections of pipe designated for the inversion process. The bypass <br />shall be made by plugging the line at an existing upstream manhole and pumping <br />the flow into a downstream manhole or adjacent system. The pump and bypass <br />lines shall be of adequate capacity and size to handle the flow. <br />