Laserfiche WebLink
<br />of these facilities . change as a result of the Prelimin.Engineering Report or Final <br />Design. <br /> <br />2. City hereby agrees to construct and install utility main(s) to said proposed lift station site <br />commencing at the nearest existing utility main(s) of sufficient size and capacity. Thence <br />along/through City rights-of-way and/or easements to proposed lift station site. City shall be <br />solely responsible for obtaining said additional rights-of-way and/or easements. Developer shall <br />dedicate, or cause to be dedicated, by fee simple warranty deed, at no cost to City, a 60' by 60' <br />lift station site adjacent to the south right-of-way line of McCabe Road and west of Taylor <br />Bayou, and any necessary easements from the lift station site to the Property. This dedication <br />shall take place within 60 (sixty) days of the execution of this Agreement and prior to the <br />issuance of a building permit for Developer's multi-family project. <br /> <br />3. City agrees to pay for the construction and installation of said main(s) including necessary <br />appurtenances. City further agrees to pay all engineering fees for survey, design, contact <br />documents, bidding, construction staking, construction inspection, and preparation of Record <br />drawings. <br /> <br />4. Developer agrees to pay, in the form of a certified check, the City for Utility Mains. The <br />amount of such payment shall be equal to $119,500.00. Said $119,500.00 payment is the <br />proportionate cost of the project that will serve undeveloped property in Southeast La Porte <br />area. It is estimated that 9 % of the future wastewater flows being served by the herein- <br />described utility mains, will come from Developer's 1O.35-acre multi-family development. <br />$119,500.00 is 9% of the project cost, currently estimated to be $1,328,330.00. After <br />completion of the construction of the utility mains, City's engineer will calculate a final proj~t <br />cost. If the final project cost is less than the estimated project cost of $1,328,330.00, then 9% <br />of the difference between the estimated project cost and final project cost will be refunded by <br />the City to the Developer. <br /> <br />5. Subject to the provisions of this Agreement, City hereby agrees to construct and install utility <br />main(s) according to the plans and specifications to be prepared by the City's engineer. When <br />the City issues a building permit for Developer's multi-family project, Developer shall deposit <br />with City in escrow a sum equal to fifty percent (50%) of the $119,500.00 as described in <br /> <br />C:/My Documents/Water and Sewer/bayou forestUEA_980512 <br />10 <br />