My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998-05-18 Special Called Regular Meeting of City Council
LaPorte
>
.Minutes
>
City Council
>
1990's
>
1998
>
1998-05-18 Special Called Regular Meeting of City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:10 PM
Creation date
7/31/2025 10:51:34 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/18/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Article 4 above. w.n thirty (30) consecutive calendar dayar the City's authorization for <br />City's contractor to begin construction of trunk sewer main and lift station facilities. Developer <br />shall deposit with City in escrow a sum equal to fifty percent (50%) of the $119,500.00 as <br />described in Article (4) above. <br /> <br />6. City agrees that connection charges for sanitary sewer shall be considered paid in full <br />development of a 1O.35-acre site shown on Exhibit" A ", when the above payment has been <br />made to City. Developer shall pay to City connection charges for water service for 1O.35-acres <br />in the amount of 32,911.76. Payment of connection charges for water service shall be made <br />when building permits are issued by the City for Developer's multi-family project. Developer <br />shall be responsible for all other customary charges. <br /> <br />7. If City does not construct and install utility mains according to plans and specifications prepared <br />by the City's engineer within sixty (60) months from the date the building permit is issued, City <br />will refund the Developer the difference between the amount Developer has paid City for <br />Wastewater facilities under this agreement and nine percent (9%) of the cost of the City's <br />engineer in preparing plans and specifications for the construction of utility mains. <br /> <br />INTERIM SERVICE <br /> <br />1. By separate agreement the Developer shall arrange for interim sewer service from the City of <br />Shoreacres. Developer acknowledges that all issues and costs related to "Interim Service" are <br />the responsibility of Developer. Developer agrees to pay for the construction and installation of <br />a sewer main(s) and lift station facilities to connect the sewage outflow from the Property to the <br />City of Shorea.cres mainline into the manhole on the north end of Bayou Forest Drive f~r <br />transporting such sewage to the Gulf Coast Waste Disposal Facility. Such construction and <br />installation shall include all necessary appurtenances. Developer further agrees to pay all <br />engineering fees for survey, design, contract documents, bidding, construction staking, <br />construction inspection, and preparation of "Record" drawings. <br /> <br />2. Developer shall furnish to City for review and approval an executed Agreement with <br />Shoreacres prior to submission of the constmction plans and specifications for interim service. <br /> <br />C:/My DocumentslWater and Sewer/bayou forestUEA_980512 <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.