Laserfiche WebLink
1.21 "Participant Director" means the General Manager of the Participant or any other <br />- <br />person designated by Participant to act as the "Participant Director." Any notice by the Participant <br />of an alternate designation or revocation of designation shall be in writing and delivered to all <br />Participants pursuant to the notice provisions herein. <br />1.22 "Peak Hour" is the 60 consecutiWe minute period during the day during which the <br />maximum amount of flow is delivered. <br />1.23 "Plant" means those water purification facilities located south of Genoa -Red Bluff <br />Road and north of Ellington Field ( known as the "Southeast Water Purification Plant"), as well as <br />the facilities referenced in Section 3.11. "'Plant" does not include any facilities owned by CWA or <br />the Treated Water Transmission Facilities even though Participants have purchased capacity in these <br />facilities. See Exhibits "C-1" and <br />1.24 "Plant and Raw Water Recoupment Cost" includes: <br />.1 Unrecovered capital costs for the Managing Participant's initial construction of the <br />Plant as shown in Exhibit "C-2." <br />.2 CWA debt service costs for the 96" Raw Waterline as described in Exhibit "C-3." <br />1.25 "Point(s) of Delivery" shall mean the point(s) at which treated surface water <br />produced by the Plant is supplied to the respective Participants at the location(s) of the flow control <br />devices. The Points of Delivery are shown on the Participant Exhibits. <br />A:\EW810975.RV1 <br />L.D. File No. 80-99146-01 <br />�I <br />FebniM 9,2000 <br />