Laserfiche WebLink
0 0 <br />.1 The CWA Trinity River Pumping Station, the CWA canal, the Lynchburg Pumping <br />Station and Reservoir, and the CWA untreated water transmission Line A as shown <br />Exhibit "A." <br />.2 Line B as shown on Exhibit "A," which begins at the Lynchburg Pumping Station <br />and follows Line A to its intersection with State Highway 225 and extends <br />westward. <br />.3 Line C as shown on Exhibit "A," which follows Line A and near the San Jacinto <br />Monument extends westward to the East Water Purification Plant. <br />.4 Line Al as shown on Exhibit "A," which connects to Line A, with interconnection <br />to Line A2, which feeds untreated water to the Plant. <br />.5 Line A2 as shown on Exhibit "A," which parallels untreated water transmission line <br />Al from the San Jancinto Monument to the Southeast Water Purification Plant. <br />1.32 "Substantial Completion" is the date on which the Modification Project can be used <br />for the production of treated water as determined by the Managing Participant Director. <br />1.3.3 "Treated Water Pumping Facilities" are those facilities located on the site of the Plant <br />which are downstream of the Treated Water Storage Facilities located on the site of the Plant and <br />upstream of any and all transmission or distribution pipelines which connect the Plant to the <br />Managing Participant's distribution and transmission pipeline system. Under no circumstances <br />shall the term Treated Water Pumping Facilities include any pipeline facilities belonging to the <br />Managing Participant, whether transmission or distribution, which are located off -site of the Plant. <br />A:\JEWBI0975.RVI <br />L.D. File No. 80-99146-01 <br />%- <br />February 9.2000 <br />