My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000-04-24 Regular Called Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2000
>
2000-04-24 Regular Called Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:13 PM
Creation date
7/31/2025 10:55:07 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/24/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />EIl' Associates will prepare a draft comment letter that addresses the analyses in each section of <br />the proponent's EIS. The comments will focus on discrepancies, inaccuracies, omissions, and lack <br />of background support for the developed analyses. The draft comment letter will be submitted <br />to the Association within three (3) weeks of receipt of the draft EIS. The Association will have <br />one (1) week to conduct review of the draft comment letter and identify changes, additions, or <br />clarifications that are necessary. EIP will then have one (1) week to amend the draft comment <br />letter and prepare and submit a final comment letter to the Association. It should be noted that <br />time allowed for the Association's review and EIl''s response to the Association's review may be <br />extended by mutual agreement if the USACOE's public review period for the draft EIS is <br />extended beyond sixty (60) days or the public hearings on the Draft EIS are scheduled later than <br />week 6 of the public review period. The EIl' Project Manager and necessary technical staff will <br />attend one (1) meeting with the Association prior to any public hearing s on the draft EIS and up <br />to one (1) public hearing on the Draft EIS. It is assumed that EIl' staff will not facilitate these <br />meetings, but will be available at the Association's direction to provide technical input on the <br />review of the Draft EIS. Attendance at additional meetings are not currently part of this work <br />plan, but can be authorized by the Association at an estimated cost of $2,350 per person for two <br />days (including meeting and travel time and other direct costs). <br />PREPARA'T'ION OF SOCIO-ECONOMIC ANALYIS <br />???? under contract to EII' will prepare an analysis of socio-economic impacts that would be <br />expected to occur within ???? miles of the proposed project. "need to provide area of potential <br />effect and scope of issues that will be addressed" "also need to determine if scope should only <br />include EA-type analysis or review of socio-economic analysis presented in draft EIS and if <br />analysis is stand alone or incorporated into the focused EA?" <br />M:UPPROACH.WPD 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.