• •
<br />Implementation Plan ,,,,,,,,,,,,,,,,,,,,,,,
<br />Chapter 13
<br />
<br />~~
<br />
<br />8,000 sq. tt pavilion at Public Facilities X PIt
<br />L.C.B. (180)
<br />San Jacinto -Update Public Facilities X pR
<br />mechanical system (190)
<br />San Jacinto -Mechanical Public Facilities PR
<br />room renovation (191)
<br />City Hall parking lot (254) Publlc Facilities X ENG, PW,
<br /> CM, CC
<br />La Porte Municipal Court Public Facilities X CM, CC
<br />(261)
<br />Improvements on the Infrastructure X X ENG, PW, CC
<br />Northeast Area Water
<br />System as recommended in
<br />the March 1998 Claunch
<br />and Miller report
<br />Complete installation of the Infrastructure X ENG, PW, CC
<br />l2" water line outer loop
<br />along Fairmont Parkway
<br />Complete water lme loops Infrastructure X ENG, PW, CC
<br />on Bay Area Boulevard.
<br />Construct 500,000 gallon Infrastructure X ]~iG, PW, CC
<br />elevated storage tank near
<br />Lomax
<br />Instal water line along Infrastructure X F.NG, PW, CC
<br />State highway 225
<br />Complete construction of Infrastructure X X ENG, PW, CC
<br />water mains along the
<br />thoroughfares to enhance
<br />pressure, to complete
<br />looped systems, and to
<br />maintain at least two feeds
<br />to all areas in the City.
<br />Sanitary sewer service to Infrastructure X ENG, PW, CC
<br />Mobile Hnme Park near
<br />Plantation and Canada
<br />Sanitary Sewer Trunk Main Infrastructure X I~TG, PW, CC
<br />to North La Porte
<br />T sanitary sewer west Lrfrastructure X X ENG, PW, CC
<br />of the Golf Course as
<br />presented in 1997 TCBcB
<br />report
<br />Bayside Sanitary Sewer Infrastructure X X ENG, PW, CC
<br />Reconstruction
<br />Sewer line rehabilitation to Infrastructure X X X ENG, PW, CC
<br />minimise infiltration and
<br />inflow so the existing
<br />treatment plant capacity
<br />rating can be maintained
<br />Bridge and Culvert Infrastructure X X X ENG, PW, CC
<br />Replacement to increase
<br />Flow Capacity.
<br />South Broadway Drainage Infrastructure X X ENG, PW, CC
<br />Problem
<br />BayMud DMP (129) Infrastructure X X ENG, PW, CC
<br />Page 13-!
<br />La Pone Comprehensive Plan Update ......................................................................................:
<br />
|