• •
<br />,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, Implementation Plan
<br />.............................................................. .........
<br />Chapter 13
<br /> . ~
<br />~~ ~
<br />Bayside sanitary sewer Infrastructure X X ENG, PW, CC
<br />reconstruction -Old Hwy.
<br />146 (153)
<br />Fairmont Park 12"water Infrastructure X ENG, PW, CC
<br />line extension (256)
<br />Sanitary sewer trunk main Infrastructure X ENG, PW, CC
<br />North La Porte (25'n
<br />Sanitary sewer extension Infrastructure X X ENG, PW, CC
<br />(258)
<br />ROW acquisition for F216 Infrastructure ENG, PW, CC
<br />(126)
<br />ROW acquisition and Infrastructure X X ENG, PW, CC
<br />improvements for F101
<br />(12~
<br />Conshvct a ad/street Streets and Sidewalks X ENG, PW, CC
<br />grade separation at 'I~
<br />Railroad and Fairmont
<br />Parkway.
<br />Construct arailroad/street Streets and Sidewalks X X ENG, PW, CC
<br />grade separation at S.l:i
<br />146 and McCabe Road.
<br />Construct sidewalks, Streets and Sidewalks X X X ENCy PW, CC
<br />handicap accessible ramps,
<br />curb cuts, pedestrian
<br />crossing signs and warring
<br />lights, and pedestrian-
<br />activated signal changers in
<br />the vicinity adjacent to the
<br />Fitness Center as well as all
<br />schools, community centers
<br />and government buildings.
<br />Install a raise pedestrian Streets and Sidewalks X ENG, PW, CC
<br />crossover across Fairmont
<br />Parkway and other major
<br />arterial roadways.
<br />Plan, fund an coordinate Streets and Sidewalks X X ENG, PW, CC
<br />transit-oriented street
<br />improvements such as bus
<br />stops and bays on potential
<br />future transit routes.
<br />Enhance public Streets and Sidewalks X X X ENG, PW, CC
<br />infrastnrcttire
<br />improvements such as
<br />streets, traffic signals, .
<br />signage, and sidewalks
<br />specifically in highly
<br />visrble areas of the
<br />community.
<br />Construct a bridge over the Streets and Sidewalks X X ENG, PW, CC
<br />pipeline easement and ditch
<br />on 11 ~` Street in west Ia
<br />Porte.
<br />Construct geometric street Strcets and Sidewalks X ENG, PW, CC
<br />improvement at Five
<br />Corners to facilitate ssrfe
<br />traffic mov~rrent.
<br />Page 13-1 ~
<br />:...................................................................................... La Porte Cumprelrensive Plan Update
<br />
|