My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003-10-13 Regular Meeting and Public Hearing
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2003
>
2003-10-13 Regular Meeting and Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:19 PM
Creation date
7/31/2025 11:01:14 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/13/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />• Mailbox access -staff will check with Post Office to change mail delivery to east side of <br />Canada to avoid residents having to cross 4-lane roadway. <br />• Property owners questioned whether regional detention was contemplated. The design uses <br />existing H Street ROW for roadway detention. The proposed detention encompasses all of H <br />Street on the east side of Canada, and a small portion of the west side. The proposed <br />detention could be expanded to include all of H Street on the west side of Canada to add a <br />portion of the adjacent property. Some additional detention would be needed to accommodate <br />all vacant property. <br />• Property donation procedures were explained by the City Attorney in detail. <br />• Potholes from construction activities of Harris County Flood Control were noted -the City <br />will keep up with repairs as needed, but would not repair major base failure until HCFCD <br />construction is completed. <br />• Initially, the Project Engineer stated that the design called for the project construction to begin <br />on the south end of the Project. Residents wanted construction to begin on north end, <br />especially the intersection of Canada and Spencer. Since that time, the Engineer has <br />determined that it would be advantageous to begin the Project on the North end. <br />10. City Council direction desired for Canada Road Project <br />• 90 days since property owner's meeting -only one property owner has donated ROW. <br />• No further progress has been made on ROW acquisition. <br />• Several alternatives aze available: <br />1. Continue waiting for donation of ROW, and place a hold on all construction. <br />2. Continue waiting for donation of ROW, and proceed with construction of northern <br />portion of Canada Road from Spencer to Cazlow. <br />3. Proceed with negotiated purchase/condemnation and fund property purchase from <br />budget. <br />4. Proceed with negotiated purchase/condemnation and fund property purchase from <br />budget, followed by assessment of property owners for all costs. <br />5. A combination of the alternatives. <br />
The URL can be used to link to this page
Your browser does not support the video tag.