Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />TIME OF COMPLETION AND LIQUIDATED DAMAGES <br /> <br />Time is of the essence in this project and the contractor must diligently pursue the <br />construction of the work so as to offer it for final acceptance by the Owner within the <br />time limit specified in the proposal. Liquidated damages 9f $10.0.00 per day shall <br />be chargeable for each day the work remains incomplete past the stated time limit. <br /> <br />CONDITIONS OF WORK <br /> <br />Each bidder must inform himself fully of the conditions relating to the construction of <br />the project and t~e employment of labor thereon. Failure to do so WiII.not relieve a <br />successful bidder of his obligation to furnish all material and labor ne.cessary to <br />carry out the provisions of his contract. Insofar as possible the contractor, in <br />carrying out his work, must employ such methoqs or means as Will .not cause any <br />interruption of or interference with the work of any other contractor. . <br /> <br />ADDENDA AND INTERPRETATIONS <br /> <br />No interpretation of the meaning of the plans, ~pecifications or other pre-bid <br />documents will be made to any bidder orally. Every request for such interpretation <br />should be in writing addressed to "City of La Porte, Attn: Planning Department, <br />604 W. Fairmont Parkway, La Po~, Texas 77571" and to be given consideration <br />must be received at least five (5)' days prior to the date fixed from the opening of <br />bids. Any and all such interpretations or any supplemental instructions will be in the <br />form of written addenda to the spec,ifications which, if issued, .will be mailed by <br />certified mail with return receipt requested to all prospective bidders (at the <br />respective addresses furnished for ~uch purposes), not later than three (3) days <br />prior to the.date fixed for the opening of bids. Failure of any bidder to receive any <br />such addendum or interpretation shall not relieve such bidder from any obligation <br />under his bid as submitted.' All addenda so issued shall become part of the' <br />contract documents. . <br /> <br />CONTRACT SECURITY <br /> <br />The Contractor shall be required to fumish a payment bond, executed on the form <br />enclosed herein, in an amol!nt at least equal to one hundred percent (100%) of the <br />total contract price, as security for the payment of all persons performing labor or <br />furnishing materials and equipment on the project. <br /> <br />NOTICE OF SUPPLEMENTAL GENERAL CONDITIONS AND SPECIAL CONDITIONS <br /> <br />Attention is particularly called to those parts of the contract qocuments and <br />specifications which deal with the following: <br />a. Survey, Permits and. Regulations <br /> <br />Page 7 of 36 <br />