My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004-05-10 Regular Meeting and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2004
>
2004-05-10 Regular Meeting and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:19 PM
Creation date
7/31/2025 11:01:57 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
5/10/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />. <br /> <br />b, Protection of Work and Property <br />c. Time of Completion and Liquidated Damages <br />d. Subsurface Conditions Found Different <br />e. Insurance <br />f. Separate Contract <br />g. Subcontracting <br />h. Photo~raphs of the Project <br /> <br />LAWS AND REGULATIONS <br /> <br />Th~ bidder's attention is directed to the fact that all applicable State laws, municipal <br />ordinances, and the rules and regulations of all authorities having jurisdiction over <br />construction of the project shall apply to the contract throughout; and they will be . <br />deemed to be included in the contract the same as though herein written out in full. <br /> <br />. . <br /> <br />METHOD OF AWARD - LOWEST QUALIFIED BIDDERS <br /> <br />If at the time this contract is to be awarded, the lowest base bid submitted by a <br />responsible bidder does not exceed the amount of funds then estimated by the <br />Owner as available to finance the contract, the contract will be awarded on the <br />base bid only. If such bid exceeds such amount, the Owner may reject all bids. <br /> <br />The Owner further reserves the right to award the contract based on an adjusted <br />base bid, which shall- consist of any combination of altemate bid items and bid <br />items inc;;luded in the base bid. <br /> <br />OBLIGATION OF BIDDER <br /> <br />At tt~e time of the opening.of bi9s eac;:h bidder will be presumed to have inspected <br />the site and to have read and to be thoroughly f~miliar with the plans and contract <br />documents (including all addenda). The failure or omission of any bidder to <br />examine any form, instrument or document shall in no way relieve any bidder from <br />any obligation in respect to his ~id. <br /> <br />SAFETY STANDARDS AND ACCIDENT PREVENTION <br /> <br />With respect to all work performed under this contract, the Contractor shall: <br /> <br />(1 ) <br /> <br />Comply with the safety standards provisions of applicable laws, puilding and <br />construction codes and the "Manual of Accident Prevention in Construction" <br />published by the Associated. General ContractorS of America, and the <br />requirements of the Occupational Safety and Health Act of 1970 (Public Law <br />91-596). - <br /> <br />Page 8 o.f 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.