My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004-11-08 Regular Meeting, Public Hearing and Workshop Meeting
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2004
>
2004-11-08 Regular Meeting, Public Hearing and Workshop Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:20 PM
Creation date
7/31/2025 11:02:37 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/8/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-,;1 <br /> <br />3.6 GENERAL PAINTING REQUIREMENTS <br /> <br />A. Exterior surfaces to receive scheduled coatings include: <br />1. All exposed wood unless noted otherwise. <br />2. Ferrous metal and galvanized metal unless notes otherwise. Touch up damaged or <br />welded metal prior to finish coat applications. <br />3. Exposed conduit and piping. <br /> <br />B. Interior surfaces to receive scheduled coating include: <br />1. All exposed wood or wood behind cabinet doors unless noted otherwise. Back- <br />priming of all wood trim, millwork or finished carpentry prior to installation. <br />2. Ferrous metal and galvanized metal unless noted otherwise; touch up damaged or <br />welded metal prior to finish coat applications. <br />3. Exposed conduit, piping, outlet boxes, raceways, and panel boxes except <br />galvanized or aluminum piping located in mechanical or electrical rooms. <br />4. All exposed gypsum board unless otherwise noted. <br />5. All exposed cmu unless otherwise noted. <br />6. Factory-primed hardware. <br />7. Metal glazing frames at plastic laminate doors. <br />8. Hollow metal doors and frames. <br />9. Exposed steel roof deck and structural roof framing members. <br /> <br />3.7 SCHEDULE <br /> <br />A. Interior Schedule <br />1. Drywall - Enamel Finish, semi-gloss: <br />1st Coat: PPG 6-2 Speedhide Latex Sealer Quick Drying Primer <br />2nd Coat: PPG 6-510 Speedhide Semi-Gloss Latex <br />3rd Coat: PPG 6-510 Speedhide Semi-Gloss Latex <br />2. Drywall-Enamel Finish, eggshell: <br />1st Coat: PPG 6-2 Speedhide Latex Sealer Quick Drying Primer <br />2nd Coat PPG 6-411 Speedhide Eggshell Latex <br />3rd Cost: PPG 6-411 Speedhide Eggshell Latex <br />3. Masonry Enamel Finish, eggshell: <br />Block Fill: 2 coats PPG 6-7 Speedhide Masonry Block Filler Latex <br />Primer: 2 coats PPG 6-7 Speedhide Masonry Block Filler Latex <br />Finish: 2 coats PPG 411 Speedhide Interior Enamel Eggshell Latex <br />4. CMU Masonry - Acrylic Epoxy, semi gloss: <br />Block fill: PPG 6-7 Speedhide Masonry Block Filler Latex <br />Primer: Pitt-Glaze Interior/Exterior Block Filler Latex <br />Finish: 2 coats Pitt-Glaze WB Water-Borne Acrylic Epoxy <br /> <br />Project No.: 328-1 <br /> <br />09910-7 <br /> <br />-r.-: ..' - , -- <br />.' . ,,~, <br />-;.'* . .F ~.-' <br /> <br />. . <br />: ~ '\ <br /> <br />.' j" :2.; <br />1'1:"/, / <br />
The URL can be used to link to this page
Your browser does not support the video tag.