Laserfiche WebLink
<br />FIRE STATION # 3 <br />PROJECT BUDGET <br />3/17/2006 <br />2000 GO BOND $ 1,110,000.00 <br />DESIGN/REIMBURSABLES $ 88,000.00 <br />LEGAL $ 2,000.00 <br />GEOTECHNICAL $ 2,475.00 <br />MATERIAL TESTING $ 15,000.00 <br />PRE-QUALIFICATION AD $ 500.00 <br />LEGAL AD $ 800.00 <br />PERMIT FEES $ 20,000.00 <br />SPECIAL INSPECTIONS $ 5,000.00 <br />GENERATOR with TRANSFER SWITCH $ 20,000.00 <br />CONSTRUCTION $ 1,462,402.00 <br />CHANGE ORDER # 1 $ (112,894.50) <br />CONSTRUCTION 5% CONTINGENCY $ 68,475.00 <br />ANTENNA $ 6,000.00 <br />COMMUNICATIONS $ 12,000.00 <br />FURNITURE $ 10,000.00 <br />APPLIANCES $ 10,000.00 <br />PROJECT COST (includes ancillary costs) $ 1,609,757.50 <br />ADDITIONAL FUNDS NEEDED $ 499,757.50 <br />