My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-04-14 Regular Meeting of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-04-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:23 PM
Creation date
7/31/2025 11:10:26 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project 908 - Rehabilitate Water Well <br /> <br />PROJECT DESCRIPTION <br />Moderate vibration in Water Well #4 has been noted over the past several months. This <br />shaft and pump (approximately 800' deep) will be pulled, inspected and all worn parts <br />replaced. Additionally, the casing will be televised to the bottom of the well te detect any <br />problems with the well shaft and screens. <br /> <br />SECOND QUARTER FY 07-08 <br /> <br />Bids received and project awarded. Expect to complete this Project in next quarter. <br /> <br />Project 933 - Design of Sens Road Utility Relocation <br /> <br />PROJECT DESCRIPTION <br />The upcoming widening of Sens Road from Spencer to North P Street will require the <br />relocation of existing water distribution and wastewater collection lines. Preliminary <br />Engineering has been completed. With the completion of the Bay Area Blvd. Trunk <br />Sewer in FY 2004-05, the potential to eliminate lift stations in the eastern portion of <br />Northwest La Porte will be incorporated in the relocation effort. <br /> <br />Phase I of the Project will complete final design of the project. Phase II, scheduled for <br />FY 2007-08 will fund the actual construction. The Project is necessary to relocate <br />existing utilities to allow the Sens Road widening to occur. <br /> <br />Final design is underway. Expect to complete in forth quarter. <br /> <br />Project 934 - Spenwick Water System/Upgrade (Phase II) <br /> <br />PROJECT DESCRIPTION <br />The water system serving the Spenwick area is two separate systems. Originally, <br />Spenwick was served by small lines in the rear yards. The County constructed new, <br />larger lines in the 80's, to improve pressures and fire protection, but the service <br />connections were never changed to the new lines. Additionally, not all streets were <br />served by the new lines. <br /> <br />SECOND QUARTER FY 07-08 <br /> <br />Engineer is working with a surveyor to tie down connection locations. Expect to bid this <br />Project in next quarter. <br /> <br />Project 938 -Aeration Improvements <br /> <br />PROJECT DESCRIPTION <br />The Wastewater Treatment Plant has been evaluated for future needs, with <br />approximately $6M in improvements identified, including engineering. <br />
The URL can be used to link to this page
Your browser does not support the video tag.