My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-04-14 Regular Meeting of La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-04-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:23 PM
Creation date
7/31/2025 11:10:26 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
4/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECOND QUARTER FY 07-08 <br /> <br />Bids awarded and construction started. Work to date includes initial excavation of new <br />aeration and clarifier basins. <br /> <br />Project 949 - Public Works Rehab - Phase I Roof <br /> <br />PROJECT DESCRIPTION <br />The existing Public Works facility is in excess of 25 years old. The building, a steel <br />frame with metal sheathing, has deteriorated over the years. The roof leaks, walls have <br />rusted through and the insulation is ruined in many areas. <br /> <br />Phase I of the Project is to remove the existing metal roof and associated trim and install <br />a new metal roof with 3 inch insulation. Phase II of the Project is to remove and replace <br />existing wall panels and insulation. <br /> <br />SECOND QUARTER FY 07-08 <br /> <br />This Project is substantially complete. Expect to complete in next quarter. <br /> <br />Project 952 - Lift Station #38 Rehab <br /> <br />PROJECT DESCRIPTION <br />This Project involves the rehabilitation of Lift Station #38 (Sunrise Drive) as <br />recommended by an engineering evaluation. The Project includes the rehabilitation of <br />the existing wet well, and the replacement of existing pumps and motors. <br /> <br />SECOND QUARTER FY 07-08 <br /> <br />Design is underway. Expect to complete design and bid the Project in next quarter. <br /> <br />Project 953 - Lift Station #6 (Design Only) <br /> <br />PROJECT DESCRIPTION <br />As recommended in the May 1984 Comprehensive Wastewater Collection and <br />Treatment Plan, the October 1997 Southeast Sanitary Sewer Trunk Main and Lift Station <br />Facilities Report, and the 2000 La Porte Comprehensive Plan a large diameter trunk <br />sewer was constructed along the west side of Bay Forest Golf Course to south of <br />McCabe Road. The project included a proposed lift station at the intersection of Taylor <br />Bayou and McCabe Road. In August 2002, La Porte secured easements for trunk sewer <br />which began construction in 2007. The construction of this line will allow the <br />development of approximately 300 acres of land. Corresponding to the culmination of <br />this project, the receiving Lift Station #6 requires upgrading to complete the project. <br /> <br />SECOND QUARTER FY 07 -08 <br /> <br />Contract for design awarded. This Project is on hold until easements can be negotiated <br />with Harris County Flood Control. Expect to complete easement acquisition and begin <br />design in next quarter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.