Laserfiche WebLink
<br />Public Works CIP Projects 3rd Quarter Status Report <br /> <br />Project 669 - Sanitary Sewer Rehabilitation <br /> <br />PROJECT DESCRIPTION <br />In May of 1993, the City filed a proposed schedule with the EPA for the <br />investigation and rehabilitation of the sanitary sewer system. The City, through <br />the use of in-house and contract labor, has been systematically working through <br />the system to identify and correct sources of inflow, as well as repair structurally <br />inadequate collection facilities. <br /> <br />THIRD QUARTER FY 07-08 <br /> <br />. Northwest La Porte Service Area - Completed 1 point repair and <br />performed 5 manhole repairs with in-house forces. <br />. Lift Station 1A Service area - Completed 6 point repairs, performed 4 <br />manhole repairs and replaced 160 feet of sewer main with in-house <br />forces. <br />. Service Area F - Completed 1 manhole repair with in-house forces. <br />. Southeast La Porte Service Area - Completed 1 point repair, performed <br />24 manhole inspections, rehabilitated 4 manholes and smoke tested 4,487 <br />feet of sewer main with in-house forces. <br />. Bay MUD Service Area - Sliplined 1,320 feet of sewer main, replaced 12 <br />service connections, completed1 manhole repair, and cleaned and <br />televised 2,724 feet of sewer main with in-house forces. Contracts forces <br />rehabilitated 776 feet of sewer main. <br />. Fairmont Park Service Area -Inspected 162 manholes and rehabilitated <br />10 manholes with in-house forces. Contract forces rehabilitated 185 feet <br />of sewer main. <br />· Spenwick Service Area - Completed 7 point repairs, rehabilitated 12 <br />manholes and smoke tested 16,650 feet of sewer main with in-house <br />forces. <br />· Brookglen Service Area - Completed 1 point repair with in-house forces. <br />· CreekmontlGlen Meadows Service Area - Completed 1 point repair and 4 <br />manhole repairs with in-house forces. Contract forces televised 3,052 feet <br />of sewer main. <br />