My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-07-14 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-07-14 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:23 PM
Creation date
7/31/2025 11:10:48 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project 825 - Airport Improvements-Ramp Program <br /> <br />PROJECT DESCRIPTION <br /> <br />Phase 1\ Improvements are planned at the La Porte Municipal Airport. Included <br />are taxiway and aircraft parking ramp reconstruction and rehabilitation, additional <br />lighting improvements, and additional fencing and gate improvements to enhance <br />security at the Airport. The FAA, through TXDOT Aviation Division will fund 90% <br />of the costs. The City's 10% matching share totals $160,000. <br /> <br />THIS PROJECT IS COMPLETE <br /> <br />Project 898 - In-house Waterline Replacement <br /> <br />PROJECT DESCRIPTION <br />Numerous waterlines within the city, primarily serving residential services, are in <br />need of replacement. These lines are typically old, undersized and of steel pipe <br />construction. The lines to be replaced will be determined. <br /> <br />THIRD QUARTER FY 07-08 <br /> <br />· 440 feet - between S. Lobit and S> Blackwell (700 feet remaining). <br />. 800 feet - between S. Iowa and S. Virginia <br />. 940 feet - between N. Broadway and N. 1st. <br /> <br />Project 908 - Rehabilitate Water Well <br /> <br />PROJECT DESCRIPTION <br />Moderate vibration in Water Well #4 has been noted over the past several <br />months. This shaft and pump (approximately 800' deep) will be pulled, inspected <br />and all worn parts replaced. Additionally, the casing will be televised to the <br />bottom of the well to detect any problems with the well shaft and screens. <br /> <br />THIRD QUARTER FY 07-08 <br /> <br />Project awarded. While attempting to pull well, shaft and pump became lodged <br />and will not be pulled at this time. Contractor instructed to reassemble above- <br />ground equipment and place back in service. Contractor is attempting to locate <br />small camera to insert in oil line access hole to assess the down-hole situation. <br />Until analysis is made, it is unknown if this well can be successfully rehabilitated, <br />or abandoned. THIS PROJECT IS COMPLETE <br />
The URL can be used to link to this page
Your browser does not support the video tag.