My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-07-14 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-07-14 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:23 PM
Creation date
7/31/2025 11:10:48 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project 933 - Design of Sens Road Utility Relocation <br /> <br />PROJECT DESCRIPTION <br />The upcoming widening of Sens Road from Spencer to North P Street will require <br />the relocation of existing water distribution and wastewater collection lines. <br />Preliminary Engineering has been completed. With the completion of the Bay <br />Area Blvd. Trunk Sewer in FY 2004-05, the potential to eliminate lift stations in <br />the eastern portion of Northwest La Porte will be incorporated in the relocation <br />effort. <br /> <br />Phase I of the Project will complete final design of the project. Phase II, <br />scheduled for FY 2007-08 will fund the actual construction. The Project is <br />necessary to relocate existing utilities to allow the Sens Road widening to occur. <br /> <br />THIRD QUARTER FY 07-08 <br /> <br />75% design documents have been submitted for review and comment. Expect to <br />complete final design in next quarter. <br /> <br />Project 934 - Spenwick Water System/Upgrade (Phase II) <br /> <br />PROJECT DESCRIPTION <br />The water system serving the Spenwick area is two separate systems. <br />Originally, Spenwick was served by small lines in the rear yards. The County <br />constructed new, larger lines in the 80's, to improve pressures and fire <br />protection, but the service connections were never changed to the new lines. <br />Additionally, not all streets were served by the new lines. <br /> <br />THIRD QUARTER FY 07-08 <br /> <br />Final review of contract documents. Expect to bid in next quarter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.