My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-07-14 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-07-14 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:23 PM
Creation date
7/31/2025 11:10:48 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
7/14/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Project 938 -Aeration Improvements <br /> <br />PROJECT DESCRIPTION <br />The Wastewater Treatment Plant has been evaluated for future needs, with <br />approximately $6M in improvements identified, including engineering. <br /> <br />THIRD QUARTER FY 07-08 <br /> <br />Work to date includes construction of clarifier and aeration basin, installation of <br />underground piping and excavation for new chlorine contact basin. Major <br />reductions in costs through redesign of existing lift station rehabilitation were <br />offset by reauthorization of previously eliminated structural painting. Net <br />reduction of Change Order #2 - $75,000. <br /> <br />Project 949 - Public Works Rehab - Phase I Roof <br /> <br />PROJECT DESCRIPTION <br />The existing Public Works facility is in excess of 25 years old. The building, a <br />steel frame with metal sheathing, has deteriorated over the years. The roof <br />leaks, walls have rusted through and the insulation is ruined in many areas. <br /> <br />Phase I of the Project is to remove the existing metal roof and associated trim <br />and install a new metal roof with 3 inch insulation. Phase II of the Project is to <br />remove and replace existing wall panels and insulation. <br /> <br />THIRD QUARTER FY 07 -08 <br /> <br />THIS PROJECT IS COMPLETE <br /> <br />Project 952 - Lift Station #38 Rehab <br /> <br />PROJECT DESCRIPTION <br />This Project involves the rehabilitation of Lift Station #38 (Sunrise Drive) as <br />recommended by an engineering evaluation. The Project includes the <br />rehabilitation of the existing wet well, and the replacement of existing pumps and <br />motors. <br /> <br />THIRD QUARTER FY 07 -08 <br /> <br />Design is 95% complete. Expect to complete design and bid the Project in next <br />quarter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.