Laserfiche WebLink
<br />Project 953 - Lift Station #6 (Design Only) <br /> <br />PROJECT DESCRIPTION <br />As recommended in the May 1984 Comprehensive Wastewater Collection and <br />Treatment Plan, the October 1997 Southeast Sanitary Sewer Trunk Main and Lift <br />Station Facilities Report, and the 2000 La Porte Comprehensive Plan a large <br />diameter trunk sewer was constructed along the west side of Bay Forest Golf <br />Course to south of McCabe Road. The project included a proposed lift station at <br />the intersection of Taylor Bayou and McCabe Road. In August 2002, La Porte <br />secured easements for trunk sewer which began construction in 2007. The <br />construction of this line will allow the development of approximately 300 acres of <br />land. Corresponding to the culmination of this project, the receiving Lift Station <br />#6 requires upgrading to complete the project. <br /> <br />THIRD QUARTER FY 07-08 <br /> <br />Awaiting response from Harris County Flood Control District on proposed <br />easement location. Expect to complete easement acquisition and begin design <br />in next quarter. <br /> <br />Project 955 - SCADA System <br /> <br />PROJECT DESCRIPTION <br />This Project involves the replacement of the twenty year old SCADA system that <br />provides for control of the LPAWA system. The system has failed completely, <br />and parts are no longer available. Water Production staff currently operates the <br />system manually. <br /> <br />THIRD QUARTER FY 07 -08 <br /> <br />Bids received and evaluated. Expect to award bid and complete this project in <br />next quarter. <br />