My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:22:12 AM
Creation date
7/31/2025 11:11:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/10/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T:h !' 1 shall 1 d a ^ge . ffie meet the ablig A c. _ <br />etion <br />3.'� "�r�--997,A. Provide a "Performance <br />Bond" and a "Labor and Material Pay.ment <br />Bond", each in a penal sum equal to 100% of Contract Sum. Bond forms shall be compatible with <br />provisions of governing authorities. File copies of bonds with County Clerk and present Owner with a <br />file receipt. <br />B. Don not commence the Work until bonds and issuing companies have been accepted as satisfactory by <br />the Owner. <br />C. Deliver original bonds to Owner with authorized power -of -attorney. <br />D. Bonds shall remain in force for and until one year after Substantial Completion of the Contract <br />§ 8.1.3 Automobile Liability (owned, non -owned and hired vehicles) for bodily injury and property damage: <br />amage shall be as set forth in Exhibit A to this Agreement and as may be further defined in Article <br />1 i of the General Conditions of the Contract <br />§ 8.1.4 Other coverage: Construction Manager shall include All Risk Policy with Windstorm and Hail coverage for <br />100% value of any structure through out the Project. Coverage shall be as set forth in Exhibit A to this Agreement <br />and as may be further defined in Article 11 of the General Conditions of the Contract <br />PAGE 21 <br />Dtff4ng both phases of the Pfejec4, the Qwne+ shall pufehase and maintain liability and pr-ep" ifisufaFfee, ine1u4iffg <br />not less than the felleA4 limits, or- gFeatef if r-eqt&ed by :In its discretion. the Owner may purchase and <br />maintain its usual liability and property insurance to protect Owner as may cover its Property under the Umbrella <br />policies. Owner's decision to purchase insurance shall not alter or change the primary coverage status of the <br />insurance provided by the Construction Manager. <br />§ 8.3 PERFORMANCE BOND AND PAYMENT BOND <br />§ 8.3.1 The Eeesa%uetien Manager (Iasert "shag" of "shall "`��gonstruction Manager shall furnish <br />payment and performance bonds covering faithful performance of the Contract and payment of ebligatiens arising <br />thereundef. 13an 1. fffay be obtained .1 gh the `' n Ma _usual soufee—,obligation arising thereunder. <br />Payment and performance bonds shall be in separate instruments Bonds may be obtained from an insurance <br />companv licensed t do business in the State of Texas and for bond amounts that exceed $100 000 that hold a <br />certificate of authority from the U.S. Secretary of the Treasury or reinsurance for liability in excess of $100 000 <br />from a reinsures authorized and admitted as a reinsurer in the State of Texas and that is a holder of a certificate of <br />authority from the U.S. Secretary of the Treasury to qualify as a surety or reinsurer on obligations permitted or <br />required under federal law and the cost thereof shall be included in the Cost of the Work. The amount of each bond <br />shall be equal to ( ) ofthe Coatm -the Guaranteed Maximum Price. If a fixed contract amount or <br />Guaranteed Maximum Price has not vet been determine at the time this Contract is awarded then the penal sums of <br />the payment and performance bonds delivered to the Owner must each be in an amount equal to the project budget <br />as specified in the Request for Proposal or Qualifications The Construction Manager shall deliver the bonds no <br />later than the tenth (10'') day after the date the Construction Manager executes the Contract unless the Construction <br />Manager furnishes a bid bond or other financial security acceptable to the Owner to ensure that the Construction <br />Manager will furnish the required payment and performance bonds when a Guaranteed Maximum Price is <br />established. <br />Additions and Deletions Report for AIA Document A121 TMCNIc — 2003 and AGC Document 565. Copyright© 1991 and 2003 by The American Institute of <br />Architects and The Associated General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and 19 <br />International Treaties. Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal <br />penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:02:34 on 12/01 /2008 <br />under Order No.1000375455_1 which expires on 10/20/2009, and is not for resale. <br />User Notes: <br />(4283007293) <br />
The URL can be used to link to this page
Your browser does not support the video tag.