My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2008
>
2008-11-10 Regular Meeting, Public Hearing and Workshop Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 8:22:12 AM
Creation date
7/31/2025 11:11:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
11/10/2008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAGE 3 <br />The Construction Manager accepts the fiduciary relationship of trust and confidence established with the Owner by <br />this Agreement, and covenants with the Owner to furnish the Construction Manager's best skill, <br />efforts, and judgment and to cooperate with the Architect in furthering the interests of dice —the Owner to build <br />the Proiect defined in the Contract Documents, in accordance with the Owner's reauirements and construction cost <br />limitations, as Owner set forth in the Contract Documents. The Construction Manager shall furnish construction <br />services (in accordance with law), administration and management services and shall use the Construction <br />Manager's best efforts to perform the Project in an expeditious and economical manner consistent with the interests <br />of the Owner. The Owner and the Construction Manager shall endeavor to promote harmony and cooperation among <br />the Owner, Architect, Construction Manager -Manager, Construction Manager's subcontractors, Program Manager <br />(if applicable), and other persons or entities employed by the Owner for the Project. <br />For the Construction Phase, the General Conditions of the contract shall be the AIA® Document A201 TM-1997, <br />General Conditions of the Contract for Construction, as amended for this Project, (the "General Conditions of the <br />Contract") which is incorporated herein by reference. For the Preconstruction Phase, or in the event that the <br />Preconstruction and Construction Phases proceed concurrently, A201 T14 P-the general Conditions of the <br />Contract shall apply to the Preconstruction Phase only as specifically provided in this Agree t-agreement. The <br />term "Contractor" as used in A201 Tm 1997 shall mean the Gens4uetien Manager, the General Conditions of the <br />Contract shall mean the Construction Manager. All Amended General or Supplementary Conditions if any, to the <br />General Conditions Contract are also incorporated herein by reference. Any reference to the General Conditions of <br />the Contract in this Agreement shall be construed as the General Conditions of the Contract as amended for this <br />Proiect. General Conditions Cost as submitted with reimbursed items as part of <br />"step 2" Proposal. <br />The Construction Manager shall perform the services described in this AAiefe—Agreement The services to be <br />provided under Sections 2.1 and 2.2 constitute the Preconstruction Phase services. If the Owner and Construction <br />Manager agree, after consultation with the Architect, the Construction Phase may commence before the <br />Preconstruction Phase is completed, in which case both phases will proceed concurrently. <br />The Construction Manager with the Architect shall jointly schedule and attend regular meetings with the Owner. <br />The Construction Manager shall consult with the Owner and Architect regarding site use and improvements and the <br />selection of materials, building systems and equipment. The Construction Manager shall provide recommendations <br />on construction feasibility; actions designed to minimize adverse effects of labor or material shortages; time <br />requirements for procurement, installation and construction eeffipletiew,-completion to satisfy Owner's time <br />requirements; and factors related to construction cost, including estimates of alternative designs or materials, <br />preliminary budgets and possible economies. <br />§ 2.1.2.1 During the Pre -Construction Phase the Construction Manager shall review the Contract Documents to <br />ascertain whether the components of the plumbing electrical and mechanical systems may be constructed without <br />interference with each other, or with the structural or architectural components of the Project or with existing <br />systems. In the event that conflicts between the systems are discovered the Construction Manager shall promptly <br />noyfy the Owner and Architect in writing_ <br />§ 2.1.2.2 Notwithstanding any provision of the General Conditions of the Contract to the contrary the Construction <br />Manager shall not be entitled to additional compensation for any delay or disruption to the Work arising from any <br />conflict between the mechanical, electrical and plumbing_ systems with each other, or with the structural or <br />architectural components of the Project or with existing systems if such conflicts should have been discovered <br />during the Construction Documents Phase by the Construction Manager through the exercise of reasonable <br />Additions and Deletions Report for AIA Document All 21 TMCMc — 2003 and AGC Document 565. Copyright © 1991 and 2003 by The American Institute of <br />Architects and The Associated General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and <br />International Treaties. Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal <br />penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:02:34 on 12/01/2008 <br />under Order No. 1000375455_1 which expires on 10/20/2009, and is not for resale. <br />User Notes: (4283007293) <br />
The URL can be used to link to this page
Your browser does not support the video tag.