and estimates for uncompleted tasks and proposed changes. The Construction Manager shall identify variances <br />between actual and estimated costs and report the variances to the Owner and Architect at regular intervals. <br />§ 2.3.3 Upon Final Completion of the Work the Construction Manager shall certify to the Owner that the Project to <br />the best of his knowledge, has been constructed in general accordance with Architect's Construction Documents <br />The certificate shall be in a form which is acceptable to the Owner and Construction Manager, signed by an officer <br />of the Construction Manager and property notarized. <br />§ 2.3.4 To the extent that any Work in Project requires a trench excavation exceeding five (5) feet in depth <br />Construction Manager shall fullycomply, and shall require any applicable subcontractor to comply, with: <br />1 the Occupational Safety and Health Administration standards for trench safety in effect for the <br />construction of the work. <br />.2 the shoring requirements, if any, of the Owner; and <br />.3 any geotechnical information obtained by Owner for use by the Construction Manager in the <br />design of the trench safety system. <br />.4 Construction Manager at Risk will contact locator service when excavating_ <br />§ 2.3.5 Trench excavation safety protection shall be a separate pay item and shall be based on linear feet of trench <br />excavated. Special shoring requirements shall also be a separate pay item, and shall be based on the square feet of <br />shoring used. Said cost shall be included within the Guaranteed Maximum Price <br />PAGE 8 <br />Section 3.12.10 of A2,0111A--449-7Tthe General Conditions of the Contract, shall apply to both the Preconstruction and <br />Construction Phases. <br />Section 10.3 of "'menthe General Conditions of the Contract, shall apply to both the Preconstruction and <br />Construction Phases. <br />§ 3.1.1 The Owner shall provide M ipfafmatien4nformation required of it pursuant to this Agreement in a timely <br />manner regarding the requirements of the Project, including a program which sets forth the Owner's objectives, <br />constraints and criteria, including space requirements and relationships, flexibility and expandability requirements, <br />special equipment and systems, and site requirements. The Commencement Date will be fixed in a notice to <br />proceed. Substantial Completion therefore is (365) calendar days from notice to proceed scheduled for December, <br />2008. <br />PAGE 9 <br />§ 3.1.3 The Owner shall establish and update an overall budget for the Project, based on consultation with the <br />Construction Manager and <br />.Architect. The Guaranteed Maximum Price shall include an Owner's <br />Contingency, which is defined as an allowance established by the Owner for the Owner's exclusive use Monies <br />from Owner's Contingency be spent in the discretion of Owner. Any unused Owner's Contingency shall <br />accrue to the Owner.. <br />In the Preconstruction Phase, the Owner shall furnish the €ellewing-items set forth in this Section 3.1.4 with <br />reasonable promptness and at the Owner's expense. Except to the *tent that the Construction Manage- knows e <br />Additions and Deletions Report for AIA Document A121 T"CMc — 2003 and AGC Document 565. Copyright© 1991 and 2003 by The American Institute of <br />Architects and The Associated General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and <br />International Treaties. Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal <br />penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:02:34 on 12/01 /2008 <br />under Order No.1000375455_1 which expires on 10/20/2009, and is not for resale. <br />User Notes: (4293007293) <br />