Laserfiche WebLink
Manager were a subcontractor. Such payments to Construction Manager shall be included in the Cost of the Work <br />but the Construction Manager shall not receive an additional Construction Manager's fee for self -performed work <br />§ 2.3.2.2 If the Guffanteed Ma*imufn 14iee has been established and a speeifie bidder- ameng these whose bids afe <br />deli ea b d e r, ..t eti n Manager- to the Owner- and A fehkeet (1) . nd a to t Owner- by <br />ethe <br />that anothei-7 bid be aeeepted, then the Geasti-aetion Manager- fftay fequ4e that a ehange in the Wer-k be issoed to <br />adjust the Ge er Time and the !_„ Mead MaN m Price by the di ffe a be�weefi the bid F 1, <br />r <br />entity r-eeemmeaded to the Owner- by the Ceasa%etiea Manager- and the amount of the subeefitFaet ef Other - <br />agreement aev&-Wy signed with the per -son or -entity designated by di n..,ae curing the course of recommending <br />proposals, the Construction Manager recommends in writing to Owner a proposal from subcontractor, but the Owner <br />requires another proposal to be accepted the Owner may compensate the Construction Manager by a change in <br />price, time, and/or Guaranteed Maximum Price for any additional cost and risk that the Construction Manager may <br />incur as a result, if such change exists. Construction Manager shall state the additional cost and/or risk in writing <br />and shall provide written proof of same before Owner compensates Construction Manager. <br />§ 2.3.2.2.1 The Construction Manager shall include the following specific notices in the formation to proposers: <br />1 The successful proposer's responsibility to provide workers' compensation insurance in <br />accordance with Texas Labor Code Chapter 406; <br />.2 The successful proposer's responsibility to pay prevailing wages pursuant to Texas Government <br />Code Chapter 2258; <br />.3 A notice of the sales tax exemption for the Project and the procedure for obtaining anyeguired <br />exemption verification or certificate; <br />.4 The notice regarding trench and shoring safety required by Texas Health and Safety Code Section <br />756.02. <br />§ 2.3.2.2.2 Nothing herein shall preclude the Construction Manager from including other notices required or allowed <br />by law <br />§ 2.3.2.3 Subcontracts and agreements with suppliers furnishing materials or equipment fabricated to a special design <br />shall conform to the payment provisions of See ie is 7.1.9 and- z.° Article 7 of this Agreement and shall not be <br />awarded on the basis of cost plus a fee without the prior consent of the Owner. <br />§ 2.3.2.4 The Construction Manager shall schedule and conduct weekly or otherwise regularly -scheduled meetings at <br />which the Owner, Architect, Construction Manager and appropriate Subcontractors can discuss the status of the <br />Work. The Construction Manager shall prepare and promptly distribute meeting minutes. The Construction <br />Manager shall provide periodic presentations updating the progress quality and status of the Work to Owner's City <br />Council, at Owner's request, at no additional cost to Owner. <br />§ 2.3.2.5 Promptly after the Owner's acceptance of the Guaranteed Maximum Price proposal, the Construction <br />Manager shall prepare a schedule in accordance with Section 3.10 of A201T"-9r, the General Conditions of the <br />Contract, , including the Owner's occupancy requirements. <br />§ 2.3.2.6 The Construction Manager shall provide monthly written reports to the Owner and Architect on the <br />progress of the entire Work. The Construction Manager shall maintain a daily log containing a record of weather, <br />Subcontractors working on the site, number of workers, Work accomplished, problems encountered and other <br />similar relevant data as the Owner may reasonably require. The log shall be available to the Owner and ^ -it. <br />Architect at any time during work hours and shall be presented for discussion at the meetings referenced in <br />subparagraph 2.3.2.4 above. <br />§ 2.3.2.7 The Construction Manager shall develop a system of cost control for the Work, including regular <br />monitoring of actual costs for activities in pr-eb ess-progress, including Changes to the Work approved by Owner <br />Additions and Deletions Report for AIA Document A121 TMCMc — 2003 and AGC Document 565. Copyright ©1991 and 2003 by The American Institute of <br />Architects and The Associated General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and 6 <br />International Treaties. Unauthorized reproduction or distribution of this document, or any portion of it, may result in severe civil and criminal <br />penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:02:34 on 12/01/2008 <br />under Order No.1000375455_1 which expires on 10/20/2009, and is not for resale. <br />User Notes: <br />(4283007293) <br />