My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2009-10-12 Regular Meeting, Public Hearing and Workshop Meeting of La Porte City Council minutes
LaPorte
>
.Minutes
>
City Council
>
2000's
>
2009
>
2009-10-12 Regular Meeting, Public Hearing and Workshop Meeting of La Porte City Council minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 7:49:49 AM
Creation date
7/31/2025 11:13:05 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Steve Gillett :" CobbFendley <br />September 25, 2009 ::� <br />Page 3 of 6 <br />• Review the Contractor's monthly application for payment and verify that the quantity of <br />work claimed conforms to the physical evidence of completed work. <br />• Review laboratory reports and shop drawings; <br />• Conduct a final inspection with the Contractor and the Owner. Prepare a list of all items <br />requiring correction prior to final acceptance. <br />ADDITIONAL SERVICES <br />Construction Inspection Services <br />Due to the uncertainty of the level of desired inspection, the possibility of the City being able to <br />perform some of this function, and the scheduling of the construction, the Compensation table <br />below does not include an allowance for this service. Once a level of effort is established, a <br />separate proposal will be submitted. <br />Other Required or Desired Services <br />Other professional services may become necessary for the satisfactory completion of the <br />project, or changes in the desired project scope may arise. Any such services will be discussed <br />with the City and an estimate of fee presented for the City's approval prior to any additional <br />services being delivered. <br />BASIS OF COMPENSATION <br />We propose to perform the described Basic Services for the following estimated hourly fees. <br />Tasks will be billed in accordance with the attached CobbFendley rate table. <br />Basic Services <br />1. Topographical Survey....................................................................................... $9,500.00 <br />2. Additional Topo Survey for MH Park easement area (if authorized) .................. $2.000.00 <br />3. Geotechnical Investigation................................................................................ $4.950.00 <br />4. Easement Surveys (3) (if authorized)................................................................ $4,000.00 <br />5. Engineering Design......................................................................................... $30,500.00 <br />6. Bidding and Construction phase....................................................................... $7,000.00 <br />Basic Services (Reimbursable Expenses) <br />1. Reproduction, mileage, delivery charges, etc .................................................... $1,000.00 <br />ADDITIONAL SERVICES <br />Services not included in the description of Scope of Services in this proposal may be provided <br />by CobbFendley, and if provided by CobbFendley, said services shall be considered to be <br />Additional Services and shall require additional fees. Additional Services require separate <br />written authorization by the Client prior to CobbFendley beginning any additional service. <br />1. Application or review fees. <br />2. Obtaining construction permit. <br />DADOCSIPROPOSAMSMALL PROPOSALS\2009\A PORTE MCCABE SEWER\PROPOSAL.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.