Laserfiche WebLink
<br />LJA Engineering & Surveying, Inc. <br /> <br />IA <br /> <br />11821 East Freeway <br />Suite 400 <br />Houston, Texas 77029 <br /> <br />Phone 713.450.1300 <br />Fax 713.450.1385 <br />www.ljaengineering.com <br /> <br />September 9, 2010 <br /> <br />Mr. Don Pennell <br />Assistant Director of Public Works <br />City of La Porte <br />P.O. Box 1115 <br />La Porte, Texas 77572-1115 <br /> <br />Re: Assignment #5 for Engineering Services <br />City of La Porte <br />Construction Documents & Plans <br />Waterline and Water Service Replacement <br />Alleyway (S. of Main Street from SH 146 to Broadway) <br />LJA Project E 170-009 <br />Proposal 10-0323 <br /> <br />Dear Mr. Pennell: <br /> <br />LJA Engineering & Surveying Inc. is pleased to submit this assignment letter to provide engineering <br />services to the City of La Porte. The City desires to relocate existing waterlines with service <br />connections from beneath the existing pavement of Main Street to the Alleyway south of Main <br />Street. The City desires to replace the existing waterline between SH 146 and Broadway. The <br />existing and proposed waterlines contain 8-inch with an estimated length of 5,005 linear feet plus <br />an additional proposed 12-inch with an estimated length of 360 feet connecting the existing 12-inch <br />waterline on 3rd Street north of Main Street to the Elevated Storage Tank on S. 4th Street. <br />Additionally, new 8-inch laterals will cross Main Street 15t and 6th Streets. The existing fire hydrants <br />will be removed and replaced. New service leads will connect the existing meters to the new <br />waterline. <br /> <br />Except for the Scope of Services, Basis of Compensation, and Schedule of Work set forth below, <br />the rights, duties, and obligations of LJA Engineering & Surveying and the City of La Porte shall be <br />as provided in the attached general services agreement which agreement is otherwise incorporated <br />herein and made a part of this assignment letter. Acceptance by the City of this assignment letter <br />shall constitute an amendment to said general services agreement. <br /> <br />The Scope of Services, Basis of Compensation, and Schedule of Work are outlined in the following <br />paragraphs: <br /> <br />SCOPE OF SERVICES <br /> <br />The scope of services can be divided into Preliminary and Design Phase, Bidding Phase, and <br />Construction Phases. The scope of each phase and/or services is defined as follows: <br />