My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010-10-11
LaPorte
>
.Minutes
>
City Council
>
2010's
>
2010
>
2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 12:07:25 PM
Creation date
7/31/2025 11:13:33 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Minutes
Date
10/11/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mr. Don Pennell <br />City of La Porte <br />September 9, 2010 <br />Page 3 <br /> <br />generally with the progress of the work, to determine in general the <br />progress and quality of the work, and to determine if the work is <br />proceeding in accordance with the contact documents. <br /> <br />c. Consult with and advise the City during construction. Engineer will <br />issue all instructions to the contractor requested by the City and <br />prepare, sign and issue routine change orders for City approval. <br /> <br />d. Review shop, laboratory and mill test of material and equipment and <br />promptly report to City any deficiencies noted. <br /> <br />e. Review shop and working drawings, furnished by contractors, for <br />compliance with design concepts and specifications and with the <br />information given by the contract documents. <br /> <br />1. Generate monthly and final estimates for payments to the contractor <br />based upon information supplied by the City. <br /> <br />g. Participate in company with the City's representative in a final <br />inspection of the project. <br /> <br />EXTRA SERVICES <br /> <br />a. Field topographic surveys. <br /> <br />b. Record drawings - Prepare and deliver to City a set of <br />reproducible record drawings showing those change made during <br />the construction period based upon change orders, marked up <br />prints, drawings and other data furnished by the contractor to the <br />engineer and which engineer deems significant. <br /> <br />COMPENSATION <br /> <br />LJA Engineering and Surveying Inc. proposes the compensation for the preliminary and design, <br />bidding, and construction phases be based upon lump sum fee as follows: <br /> <br />BASIC SERVICES <br /> <br />Preliminary Phase <br />Design Phase <br />Bidding Phase <br />Construction Phase <br /> <br />$ 10,500.00 <br />35,950.00 <br />2,700.00 <br />5,400.00 <br /> <br />Total Basic Services Cost <br /> <br />$ 54,550.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.